My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0010488
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TAM O SHANTER
>
6215
>
3500 - Local Oversight Program
>
PR0544683
>
ARCHIVED REPORTS XR0010488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2019 3:10:11 PM
Creation date
7/22/2019 8:15:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010488
RECORD_ID
PR0544683
PE
3528
FACILITY_ID
FA0004953
FACILITY_NAME
NORMAC INC
STREET_NUMBER
6215
STREET_NAME
TAM O SHANTER
STREET_TYPE
DR
City
STOCKTON
Zip
95209
APN
09405011
CURRENT_STATUS
02
SITE_LOCATION
6215 TAM O SHANTER DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Cuttings from each borehole to be described and logged by the <br /> R. G. as drilling proceeds. <br /> 4. Split-spoon samples will be taken every 5 feet from 20 ` bgi to <br /> the bottom of each boring using properly prepared brass tubes. Each <br /> sample will be briefly described, sealed, labeled, and placed on ice <br /> pending transport to FGL laboratory for analysis. <br /> 5. Solei samples will be transported to FGL Environmental under <br /> proper chain--of-custody, with instructions to test for BTEX using <br /> EHD approved detection limits. <br /> b. Drill cuttings will be placed in properly labeled and sealed <br /> steel drums and stored onsite pending results of the laboratory <br /> analyses. <br /> 7. All boreholes will be properly grounted with cement from total <br /> drilled depth to the surface in accordance with County regulations. <br /> All drilling and sampling operations will be supervised by a <br /> Registered Geologist, and witnessed as necessary by a representative <br /> of the EHD. <br /> The drilling permit previously issued for APN 094-05-'-21 is still <br /> valid, and will cover the work being done under this addendum. It <br /> is planned to commence this work during the week of July 20th if a <br /> drilling rig can be secured. Your office will be notified as soon <br /> as a date has been set. <br /> Programs for further work will depend upon the results of the <br /> laboratory nalyses. <br /> Wm. nter & Associates <br /> cc- ormac (w/o attach) <br /> Spectrum Exploration (w/o attach) <br />
The URL can be used to link to this page
Your browser does not support the video tag.