Laserfiche WebLink
3. Cuttings from each borehole to be described and logged by the <br /> R. G. as drilling proceeds. <br /> 4. Split-spoon samples will be taken every 5 feet from 20 ` bgi to <br /> the bottom of each boring using properly prepared brass tubes. Each <br /> sample will be briefly described, sealed, labeled, and placed on ice <br /> pending transport to FGL laboratory for analysis. <br /> 5. Solei samples will be transported to FGL Environmental under <br /> proper chain--of-custody, with instructions to test for BTEX using <br /> EHD approved detection limits. <br /> b. Drill cuttings will be placed in properly labeled and sealed <br /> steel drums and stored onsite pending results of the laboratory <br /> analyses. <br /> 7. All boreholes will be properly grounted with cement from total <br /> drilled depth to the surface in accordance with County regulations. <br /> All drilling and sampling operations will be supervised by a <br /> Registered Geologist, and witnessed as necessary by a representative <br /> of the EHD. <br /> The drilling permit previously issued for APN 094-05-'-21 is still <br /> valid, and will cover the work being done under this addendum. It <br /> is planned to commence this work during the week of July 20th if a <br /> drilling rig can be secured. Your office will be notified as soon <br /> as a date has been set. <br /> Programs for further work will depend upon the results of the <br /> laboratory nalyses. <br /> Wm. nter & Associates <br /> cc- ormac (w/o attach) <br /> Spectrum Exploration (w/o attach) <br />