My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19555
>
2800 - Aboveground Petroleum Storage Program
>
PR0515643
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:55:56 PM
Creation date
7/23/2019 10:40:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515643
PE
2832
FACILITY_ID
FA0009433
FACILITY_NAME
HAMMER TRUCKING INC
STREET_NUMBER
19555
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
01321026
CURRENT_STATUS
01
SITE_LOCATION
19555 N HWY 99 FRONTAGE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hammer Trucking, Inc. <br /> Engineering Certification <br /> 40 CFR 112.3(d)(1)(iv) <br /> I hereby certify that: <br /> 1. I am familiar with the applicable SPCC Plan requirements of 40 CFR 112.7; <br /> 2. Either I or my agent has visited and reviewed this site; <br /> 3. The SPCC Plan is prepared with good engineering practices, best management <br /> practices and applicable industry standards; <br /> 4. The procedures for the SPCC requirements of frequent inspections and periodic testing <br /> is established herein; <br /> 5. This SPCC Plan is adequate for the facility. <br /> Print name of Registered Professional Engineer <br /> Signature of Registered Professional Engineer <br /> Registration Number - State of California <br /> Date of signature <br /> Location of SPCC Plan 40 CFR 112.3(e) <br /> Hammer Trucking, Inc. maintains their SPCC Plan in the main office building, located at <br /> 19555 North Hwy. 99, Acampo, CA 95220. The SPCC Plan is placed in a position to enable the <br /> staff of Hammer Trucking, Inc. to have easy access to record their monthly inspections, and to <br /> assist them in spill containment procedures. Office hours and availability of the SPCC Plan are <br /> from 8 AM —4:30 PM, Monday—Friday, excluding major holidays. <br /> 5 <br /> * Gary Reeves, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.