Laserfiche WebLink
EXTENSIVE FIELD WORK NOTICE <br /> TO: DATE: 06/18/2014 <br /> Kevin Schinmann, 7-Eleven, Inc.,Market Manager (2369) kevin.schinmann@7-1 l.com <br /> Katherine Marilao; Field Consultant katherine.marilao@7-11.com <br /> Jose Rios, 7-Eleven, Inc., MES iose.rios@7-1 t.com <br /> John Wainwright, Stantec, RSPM iohn.wainwright@stantec.com <br /> Georgina Davila, 7-Eleven, Inc., RPM georaina:davla@7-1 l.com <br /> Olan Smith, 7-Eleven, Inc., DFM olan.smith@7-1l.com <br /> Stephen Boyd, 7-Eleven, Inc., RGECM stephen.boyd@7-1 l.com <br /> Deanne Rotta, 7-Eleven, Inc., RGECS deanne.rotta@7-1 l.com <br /> Vicki McCartney,SJCEHD vmccartney@sicehd.com <br /> Johhny Yoakum,SJCEHD jyoakum@sjcehd.com <br /> Gurpreet Matharu, Franchisee (209) 239-3252 <br /> RE: 7-Eleven Store Number: 19976 (Market 2369) <br /> Site Address: 1399 North Main Street <br /> Manteca, CA <br /> Field Activities: Groundwater monitoring well destruction <br /> Dear All: <br /> This serves as notification that the destruction of groundwater monitoring and remediation wells <br /> at the above referenced 7-Eleven store is scheduled to begin on Monday,July 7,2014.This work <br /> is being conducted in order to destroy all groundwater monitoring and remediation wells <br /> associated with the environmental case closure as directed by the San Joaquin County <br /> Environmental Health Department.It is anticipated that the well destruction activities will be <br /> completed within ten (10) business days.The well destruction activities will not impede store <br /> operations and the site will remain accessible for guests. <br /> During the destruction of SG-12 and SG-13, two to three parking spaces will be closed; these <br /> areas are anticipated to be closed for a maximum of four hours each. During the destruction of <br /> MW-5 and MW-5A, the northern driveway accessed via Northgate Drive will be closed for one <br /> day. During the destruction of MW-3,the eastern driveway accessed via North Main Street will <br /> be closed for approximately four hours.During the destruction ofMW-1/MW-1 A, MW-2 and <br /> SG-15, access to one side of the dispensers may be closed for approximately four hours. <br /> The asphalt areas impacted by groundwater monitoring well destruction activities will be <br /> covered with a temporary patch and resurfaced at a later date. Well destruction debris <br /> generated during this scope of work will be temporarily stored in 55-gallon drums or a soil bin on <br /> the northwest portion of the property pending removal for disposal within one week of the <br /> completion of the destruction activities. <br /> Sincerely, <br /> Stantec Consulting Services Inc. <br /> Danielle Manning <br /> Project Manager <br /> Stantec Consulting Services Inc. <br /> Ph: (916) 384-0706 <br /> Fx: (916)861-0430 <br /> Cell: (916) 281-4942 <br /> Danielle.manning@stantec.com <br />