Laserfiche WebLink
fl <br /> Addendum to the Additional Site Assessment Report and Work Plan For Additional Subsurface Investigation 2 <br /> The Southland Corporation,Store#19976,1399 N.Main St,Manteca,CA August 3,1998 <br /> M. Within four to sox weeks of receipt of all field and analytical findings, Fluor Daniel GTI will prepare a report 4 <br /> summarizing the data collected under the scope of work detailed above. The report will document the <br /> methods and results of the work, summarize laboratory analytical results,and include appropriate maps <br /> i <br /> [ncluding a cross section diagram of the contamination plume and a three-dimensional diagram of the j <br /> plume and associated lithology). <br /> If you have any questions or comments concerning this letter, please call our Martinez office at(925) 370- <br /> 3990. <br /> Sincerely, <br /> Fluor Daniel GTI,Inc. Fluor Daniel GTI,Inc. <br /> Submitted by: Approved by: <br /> Bob Butler Shelby Lathrop <br /> Associate Geologist Project Manager <br /> Ed K. Simonis, R.G. = �� <br /> Senior Geologist aL" QED) <br /> No.4422 <br /> # c: Mrs. Carol Oz-San Joaquin County Public Health Services <br /> Attachments <br /> 1. Figures <br /> i <br /> n <br /> I <br /> 1 F - <br /> •I <br /> t FLUOR DANIEL GTI <br />