Laserfiche WebLink
spm Pre'enomn,Comnot and ronmaaoexso.es Pm. <br /> Poil of Smckton <br /> N,4 <br /> Table I—East Complex Facility Oil Containers <br /> Container Volume Container <br /> Contents allons I.D.^ Discharge Prevention Discharge Controls' <br /> Aboveground Storage Tank(ASTs) <br /> •Trained fuel delivery , Outer wall of double- <br /> drivers are present walled AST provides <br /> , <br /> Gasoline 5000 when the AST is being secondary containment. <br /> (Photo 1) filled. • Fill pipe is equipped with <br /> AST-1 • Drivers constantly a spill box and backflow <br /> (Dual monitor transfer prevention valve. <br /> process.Compartment p • Facility personnel are to <br /> Tank) •Liquid level should be be trained in spill <br /> visible at the filling <br /> response measures. <br /> Gasoline area. • Adequately-sized spill <br /> (Photo l) 5,000 • Periodic visual kits re staged in of <br /> inspections are to be <br /> conducted. storage area. <br /> •Trained fuel delivery <br /> drivers are present • Outer wall of double- <br /> when the AST is being walled AST provides <br /> filled. secondary containment. <br /> • Fill pipe is equipped with <br /> • Drivers constantly a spill box and backflow <br /> Diesel monitor transfer prevention valve. <br /> 4,000 AST-2 process. <br /> (Photo 2) • Liquid level should be • Facility personnel are to <br /> visible at the filling be trained in spill <br /> response measures. <br /> area. • Adequately-sized spill <br /> • Periodic visual kits are staged in oil <br /> inspections are to be <br /> conducted. storage areas. <br /> •Trained fuel delivery <br /> drivers are present <br /> when the AST is being • Outer wall of double- <br /> filled. walled AST provides <br /> • Drivers constantly secondary containment. <br /> Diesel AST-3 monitor transfer • Facility personnel are to <br /> (Photo 3) 250 Administration process, be trained in spill <br /> Genset • Liquid level should be response measures. <br /> visible at the filling • Adequately-sized spill <br /> area. kits are staged in oil <br /> • Periodic visual storage areas. <br /> inspections are to be <br /> conducted. <br /> NoIn <br /> T Pi aure 3 includes locations of rain]ty oil containers. <br /> BContainmeni capncity calculations provided in Appendix I. <br /> h <br /> 10 CONDOR <br />