Laserfiche WebLink
S Pi 11 Pmvenlloa,Comaol.a W Counlenneasums flan <br /> Pon of Slocklon <br /> Page 6 <br /> Table 2—West Complex Facility Oil Containers <br /> ContainerVolume Conta ner Discharge Prevention Discharge Controls" <br /> Contents :,,Ions I-D. <br /> ASTS <br /> • Outer wall ofdouble- <br /> •Trained personnel are to walled AST provides <br /> be present when the AST secondary containment. <br /> is operated and . Facility personnel are to <br /> constantly monitor be trained in spill <br /> Used Oil 240 AST-4 transfer process. response measures. <br /> (Photo 4) • Liquid level is visible at • Residual spills are to be <br /> the filling area. cleaned up with absorbent <br /> • Periodic*visual material upon detection. <br /> inspections are to be • Adequately-sized spill <br /> conducted. kits are staged in oil <br /> smajac areas. <br /> • Each AST has its own <br /> •Tanks are to be filled by containment structure <br /> trained delivery with an approximate <br /> personnel who capacity of 320 gallons <br /> constantly monitor tank • Facility personnel are to <br /> Motor Oil 280 AST-5 fluid level. be trained in spill <br /> (Photo 5) (x 2) AST-6 • Liquid level should be response measures. <br /> visible at the filling area. ' Residual spills are to he <br /> • Periodic visual cleaned up with absorbent <br /> inspections are to be material upon detection. <br /> conducted. • Adequately-sized spill <br /> kits are staged in oil <br /> storage areas. <br /> e Outer wall ofdouble- <br /> • Trained fuel delivery walled AST provides <br /> drivers are present when secondary containment. <br /> the AST is being filled. o Fill pipe is equipped with <br /> • Tmined personnel are to a spill box and backflow <br /> be present when the AST prevention valve. Facility <br /> Diesel 3,000 AST-8 is operated and personnel are to be <br /> (Photo 6) (x 2) AST-9 constantly monitor trained in spill response <br /> transfer process. measures. <br /> • Liquid level should be • Residual spills are to be <br /> visible at the filling area. cleaned up with absorbent <br /> • Periodic visual material upon detection. <br /> inspections are to be • Adequately-sized spill <br /> conducted. kits are staged in oil <br /> storage areas. <br /> r <br /> CONDOR <br />