My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2800 - Aboveground Petroleum Storage Program
>
PR0538721
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 9:13:32 AM
Creation date
7/23/2019 1:53:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0538721
PE
2832
FACILITY_ID
FA0009480
FACILITY_NAME
STOCKTON PORT DIST
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502004/162030
CURRENT_STATUS
01
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S Pi 11 Pmvenlloa,Comaol.a W Counlenneasums flan <br /> Pon of Slocklon <br /> Page 6 <br /> Table 2—West Complex Facility Oil Containers <br /> ContainerVolume Conta ner Discharge Prevention Discharge Controls" <br /> Contents :,,Ions I-D. <br /> ASTS <br /> • Outer wall ofdouble- <br /> •Trained personnel are to walled AST provides <br /> be present when the AST secondary containment. <br /> is operated and . Facility personnel are to <br /> constantly monitor be trained in spill <br /> Used Oil 240 AST-4 transfer process. response measures. <br /> (Photo 4) • Liquid level is visible at • Residual spills are to be <br /> the filling area. cleaned up with absorbent <br /> • Periodic*visual material upon detection. <br /> inspections are to be • Adequately-sized spill <br /> conducted. kits are staged in oil <br /> smajac areas. <br /> • Each AST has its own <br /> •Tanks are to be filled by containment structure <br /> trained delivery with an approximate <br /> personnel who capacity of 320 gallons <br /> constantly monitor tank • Facility personnel are to <br /> Motor Oil 280 AST-5 fluid level. be trained in spill <br /> (Photo 5) (x 2) AST-6 • Liquid level should be response measures. <br /> visible at the filling area. ' Residual spills are to he <br /> • Periodic visual cleaned up with absorbent <br /> inspections are to be material upon detection. <br /> conducted. • Adequately-sized spill <br /> kits are staged in oil <br /> storage areas. <br /> e Outer wall ofdouble- <br /> • Trained fuel delivery walled AST provides <br /> drivers are present when secondary containment. <br /> the AST is being filled. o Fill pipe is equipped with <br /> • Tmined personnel are to a spill box and backflow <br /> be present when the AST prevention valve. Facility <br /> Diesel 3,000 AST-8 is operated and personnel are to be <br /> (Photo 6) (x 2) AST-9 constantly monitor trained in spill response <br /> transfer process. measures. <br /> • Liquid level should be • Residual spills are to be <br /> visible at the filling area. cleaned up with absorbent <br /> • Periodic visual material upon detection. <br /> inspections are to be • Adequately-sized spill <br /> conducted. kits are staged in oil <br /> storage areas. <br /> r <br /> CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.