Laserfiche WebLink
Spill Prevention,Comml,and Counnumnsures Plan <br /> Pan orSmcktnn <br /> Page 8 <br /> Table 2—West Complex Facility Oil Containers <br /> Container I Volume Container Discharge Prevention Discharge Controlsa <br /> Contents nitons LD. <br /> 55-Gallon Drumsc <br /> • Drains are stored on <br /> Grease 55 gal, I drum secondary contained <br /> (Photo 8) (up to 55 gl.} pallets. <br /> • Drums located inside • Additional containment is <br /> Building 804 (Figure 4). provided by be.nned <br /> Motor Oil • Drums are to have hand concrete bays inside the <br /> 55 al. 8 Bruns building, with <br /> (Photo 8) g b,pm 44o go pumps,bung caps, or approximate capacities of <br /> removable lids installed. 275 and 550 gallons. <br /> •Oil transfers are to be o Facility personnel are to <br /> monitored by Facility be trained in spill <br /> personnel. response measures. <br /> • Periodic visual • Residuals ills are to be <br /> Hydraulic inspectionsto be p <br /> R drums are cleaned u with absorbent <br /> (Photo 8) 55 gal.(up to44ogala conducted material upon detection. <br /> • Adequately-sized spill <br /> kits are staged in oil <br /> storage areas. <br /> • Containment is provided <br /> Used by concrete burin inside <br /> Cleanup 1 drmn • Dmms are located inside the building,with an <br /> Material SS gal. lurrossg,l,l Building 804 (Figure 4). approximate capacity of <br /> (Photo 9) • Dimas are sealed with a 275 gallons. <br /> removable lid. • Facility personnel are to <br /> • Oil transfers are to be be trained in spill <br /> monitored by Facility response measures. <br /> personnel. • Residual spills are to be <br /> Used 3 drums <br /> Periodic visual cleaned up with absorbent <br /> Absorbent 55 gal. lup to 165 gal l inspections are to be material upon detection. <br /> (Photo 9) conducted. • Adequately-sized spill <br /> kits are staged in oil <br /> storage areas. <br /> Note <br /> A-Figures 4 and 5 mdude locations of Facility it couhnne ,. <br /> B:Containment capacity calculations provided in Appendix I. <br /> C:The number ofcontainers vanes.The values in the Container 1,1).colunm represaa a maximum number of,mi u item for that <br /> type of oil al the Facilily or in a given location. <br /> " Used oil tanks may have more frequent inspection cycles under other regulatory programs. <br /> 1.2.4 Countermeasures and Disposal(40 CFR I12.7(a)(3)(iv) and(v)I <br /> Port staff are to be trained in the location and use of absorbents and spill notification requirements. <br /> Transporters maintain additional spill equipment on their vehicles and are to respond to spills during <br /> filling operations. The drivers are required to immediately notify the Facility Response Coordinator of <br /> any spills. "Report Spills Immediately' signs including Port contact information are located in plain view <br /> at the fueling islands. <br /> A <br /> �� CONDOR <br />