My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 8:27:54 AM
Creation date
7/24/2019 8:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Infurna, Jr. 4 February 1997 <br /> San Joaquin County Environmental Health Division Page 2 <br /> .r <br /> 3) Soil vapor extraction system data for the period ending February 1996 will be presented <br /> rtin the fast qua-ter 1997 quarterly monitoring report. Based on a preliminary review of <br /> ;'that data collected by the previous consultants, Aegis Environmental, Inc. and Fugro <br /> 1�West, it appears that the soil vapor extraction system should be restarted. <br /> 4) A well survey and subsurface conduit survey will be conducted if a risk-based site closure <br /> is required following completion of soil remediation at the site. <br /> 5) The Aegis Environmental and Fugro West files will by searched for monitoring well <br /> construction details and-soil boring logs._These data may aid in the-preparation of water. <br /> table contour maps (issue 2). The well construction detail reports and a table <br /> summarizing their construction will be submitted with the first quarter 1997 quarterly <br /> 11 monitoring report. <br /> If you have any questions, please feel free to contact me at (510) 283-7077. <br /> Sincerely, <br /> James R. Brownell, R.G. <br /> Senior Geologist <br /> cc: !RMs. Marla GuensIer, Exxon Company, U.S.A. <br /> BMs. Christa Marting, EA Engineering <br /> rf <br /> l <br /> IE <br /> II <br />
The URL can be used to link to this page
Your browser does not support the video tag.