My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008619
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
3500 - Local Oversight Program
>
PR0544687
>
ARCHIVED REPORTS XR0008619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 8:56:04 AM
Creation date
7/24/2019 8:25:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008619
RECORD_ID
PR0544687
PE
3528
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•! R <br /> 4e �1 t' year ',;T <br /> FUGRO WEST, INC. ill Oil <br /> —.---------1050 Melody Lane,Suite 160 -- <br /> January 18, 1996 Roseville California 95678 <br /> Project No 9347-1044 Tel (916)782-2110 <br /> FAX (916)786-7830 <br /> Mil Bruce Tuter <br /> San Joaquin Valley Unified <br /> Air Pollution Control District <br /> 4230 Kieman Avenue, Suite 130 <br /> Modesto, CA 95356 <br /> Subject System Start-up and Emission Verification Report <br /> Authority to Construct Permit No N-3478-1-0 <br /> Exxon RAS #7-0137 <br /> 1605 S El Dorado Street, Stockton, CA <br /> Dear Mr Tuter <br /> On behalf of Exxon Company, U S A (Exxon), Fugro is submitttng this report documenting <br /> emission quantification for vapor extraction system start-up at the subject site (Figures 1 and 2) <br /> System start-up was performed on November 13, 1995 Two influent and two effluent samples were <br /> retrieved for laboratory analysis during start-up <br /> System operating parameters are presented in Table 1 The laboratory analytical reports are <br /> included in Attachment A and results are summarized in Table 2 influent extraction rates, effluent <br /> emission rates, and hydrocarbon emission control efficiencies are also summanzed in Table 2 An as- <br /> built process flow diagram including sampling locations is shown on Figure 3 The equations used for <br /> flow rate calculations and an example calculation are presented in Attachment B <br /> Authority To Construct Permit No N-3478-1-0 stipulates either the VOC control efficiency <br /> shall not be less than 95% or the total VOC emission rate shall not exceed 2 pounds in any one day, <br /> and the total VOC emission rate from the soil remediation system served by the catalytic oxidizer shall <br /> not exceed 6 5 pounds in any one day Based on the start-up data, the maximum VOC emission rate <br /> was deterniuned to be less than 2 7 lbs/day,with a 96 1 %control efficiency <br /> a <br /> 93471044 ARP <br /> A member of the Fugro group of companies with offices throughout the worlds <br />
The URL can be used to link to this page
Your browser does not support the video tag.