Laserfiche WebLink
-t <br /> SRO <br /> Mr Bruce Tuter <br /> S Y January 18, 1996 {9347-1044} <br /> The system start-up and emission verification test was performed while extracting from wells <br /> VEW-1, VEW-2, MW-2, MW-3, and MW-5 Influent and effluent flow parameters were measured <br /> every 1/2 hour during the 2-hour start-up monitonng and sampling penod The measured flow <br /> parameters included air velocity pressures, which were measured with a pitot tube and a differential <br /> pressure gauge, static pressures, which were measured with a differential pressure gauge, temperatures, <br /> which were measured with a thermocouple meter, and VOC concentrations, which were measured <br /> with a portable meter using flame ionization detection Two sets of influent and effluent air samples <br /> were also collected for laboratory analysis The air emission vapor sampling was conducted in <br /> accordance with Fugro's standard operating procedures which are included in Attachment C The air <br /> samples were analyzed for TPH-g, and benzene, toluene, ethylbenzene, and total xylenes (BTEX) by <br /> Sequoia Analytical, of Redwood City, California Please contact us at (916) 782-2110 if you have any <br /> questions <br /> Sincerely, <br /> Fugro West,Inc <br /> Douglas K Dieter,P E <br />�i Mechanical Engineer <br /> 111 41 o"- <br /> Mark 14 Naugle,P E <br /> Project Manager <br /> DKD/M[HN sh <br /> Attachments <br /> cc Ms Maria Guensler,Exxon Company, U S A <br /> Mr Michael Infurna, San Joaquin County Environmental Health <br /> 93471044 ARP -2- <br />