My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
COMPLIANCE INFO 2012 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:45:55 PM
Creation date
7/24/2019 9:18:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2018
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER -DISPENSER CONTAINMENT (UDCI TFSTIN6 <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />® Other (Specify) Caldwell Sump Tester <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Caldwell Sump Tester <br />Equipment Resolution: 0.005 inches in <br />UDC# 1 <br />UDC #2 <br />UDC #3 <br />UDC# <br />UDC Manufacturer: Unknown <br />Unknown <br />Unknown <br />UDC Material: Plastic <br />Plastic <br />Plastic <br />UDC Depth: 6 inches <br />6 inches <br />6 inches <br />Height from UDC Bottom to 0 inches <br />0 inches <br />0 inches <br />Top of Highest Piping <br />Penetration: <br />Height from UDC Bottom to N/A <br />N/A <br />N/A <br />Lowest Electrical Penetration: <br />Condition of UDC prior to Dry <br />Dry <br />Dry <br />testing: <br />Portion of UDC Tested 6 inches <br />6 inches <br />6 inches <br />Does turbine shut down when ®Yes ❑No ❑N/A <br />UDC sensor detects liquid <br />®Yes ❑No ❑N/A <br />®Yes ❑No ❑N/A <br />[—]Yes [:]No ❑N/A <br />Turbine shutdown response 3 sec <br />3 sec <br />3 sec <br />time <br />Is system programmed for <br />fail-safe shutdown ®Yes ❑No ❑N/A <br />®Yes ❑No [:]N/A <br />®Yes ❑No ❑N/A <br />❑Yes ❑No E] N/A <br />Was fail-safe verified to be ®Yes ❑No ❑N/A <br />operational <br />®Yes ❑No ®N/A <br />®Yes ❑No [—]N/A <br />❑Yes ❑No ❑N/A <br />Wait time between applying <br />pressure/vacuum/water and 5 minutes <br />5 minutes <br />5 minutes <br />starting test <br />Test Start Time: 10:50 <br />10:55 <br />11:00 <br />Initial Reading (R): 2nd Ring <br />2"d Ring <br />2"d Rin <br />Test End Time: 11:20 <br />11:25 <br />11:30 <br />Final Reading (RF): 2"d Ring <br />2nd Ring <br />2nd Rin <br />Test Duration: 30 minutes <br />30 minutes <br />30 minutes <br />Change in Reading (RF -R,): 0 Change <br />0 Change <br />0 Change <br />Pass/Fail Threshold or Criteria: 0.005 inches in 1/2 <br />0.005 inches in <br />0.005 inches in 1/2 <br />hour <br />1/2 hour <br />hour <br />Test Result: Pass Lj Fail <br />N Pass <br />Pass D Fail <br />El Pass D Fail <br />Fail <br />Was sensor removed for ®Yes ❑No ❑N/A <br />®Yes ❑No ❑N/A <br />®Yes [—]No❑N/A <br />❑Yes ❑No [—]N/A <br />testing? <br />Was sensor properly replaced <br />and verified functional after ®Yes []No ❑N/A <br />®Yes ❑No [—]N/A <br />®Yes ❑No ❑N/A <br />[-]Yes ❑No ❑N/A <br />testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br />tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.