My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
COMPLIANCE INFO 2012 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 4:45:55 PM
Creation date
7/24/2019 9:18:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2018
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 1 Hour Observed Test <br />Equipment Resolution: 1/16 of an inch <br />Spill Box # 91 Fill <br />Spill Box # Red <br />Diesel <br />Bucket Diameter: <br />12 inches <br />12 inches <br />Bucket Depth: <br />15 inches <br />15 inches <br />Wait time between <br />applying <br />10 Minutes <br />10 Minutes <br />pressure/vacuum/water <br />and starting test: <br />Test Start Time: <br />9:50 <br />9:50 <br />Initial Reading (R,): <br />5" above cap <br />3 1/4" above cap <br />Test End Time: <br />10:50 <br />10:50 <br />Final Reading (RF): <br />5" above cap <br />3 1/4" above cap <br />Test Duration: <br />1 hour <br />1 hour <br />Change in Reading (RF <br />0 change <br />0 change <br />R): <br />Pass/Fail Threshold or <br />1/16`h" <br />1/16th" <br />Criteria: <br />Test Result: <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br />tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.