Laserfiche WebLink
Mr. Wayne Deitz • 0 June 25,2008 <br /> Workplan—Groundwater Sampling Page 5 of 5 <br /> SCHEDULE FOR SERVICES <br /> Once the SJCEHD permit is obtained, ROKEN plans to make contractor arrangements, complete the <br /> field work and prepare and submit a draft report within three(3)weeks. <br /> Sincerely, <br /> ROKEN ENGINEERING SERVICES �PE0 G,pozo <br /> Cr. MIGtIPEL L.WHIGt11 Ni <br /> tJo.6924 <br /> Michael Wright, PG <br /> Principal-Operations Manager OFC <br /> ATTACHMENTS: FIGURE 1 —Site Map <br /> C: Ms. Margaret Lagorio, San Joaquin County Environmental Health Department <br /> 5 <br />