Laserfiche WebLink
qa re�min Real Estate fnve <br /> N , <br /> Path to Closure Plan O GEOTRACKER HOME I MANAGE PROJECTS I REPORTS I SEARCH I LOGOIJT <br /> MCBILLIN REAL ESTATE INVESTMENT (710000002615) - MAP THIS SITE - OPEN - SITE ASSESSMENT <br /> 2154 SOUTH EL DORADO STREET CLEANUP OVERSIGHT AGENCIES <br /> STOCKTON , CA 95206 ACTIVITIES REPORT SAN JOAQUIN COUNTY LOP (LEAL) - CASE#: 1910 <br /> CASEWORKER: VICKI MCCARTNEY - SUPERMSOR: AORIENNEELLSAESSER <br /> SAN JOAQUIN COUNTY PUBLIC VVEBPAGE CENTRALVALLEY RMCB (REGION 5S) - CASE#: 391184 <br /> VIEW PRINTABLE CASESUMMARY FORTHIS SITE CASEWORKER: JAMESBARTON - SUPERVISOR CORI CONDON <br /> CUF Claim #. 19188, B0120 CUFPrIadtVAssiamed: B CUFAmountleald: S13145 <br /> THIS PROJECT WAS LAST MODIFIED BY laCAUMCCARTNEYON 10.2820132:50:01 PM - HISTORY <br /> THIS SITE HAS SUBMITTALS. CLICK HERE TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE <br /> Path to Closure Plan - FY 12/13 THIS VERSION IS FINAL AS OF1012S2013 PATH TO CLOSURE HISTORY CLEAR A RESET PATH TO CLOSURE PLAN <br /> IMPEDIMENT 1 : <br /> General Criteria E: A conceptual site model that assesses the nature, extent, and mobility of the release [i Procedural Impediment - NFO <br /> has NOT been developed <br /> Step to Resolve Impediment 1 - Step 1: -DELETE STEP COMPLETION DATE <br /> p e and submit a work plan to install monitoring wells to complete groundwater assessment . <br /> PROJECTED1013012013 1 <br />( Step to Resolve Impediment l - Step 2: - DELETE STEP COMPLETION DATE <br /> Install pp ved monitoring wells . <br /> ACTUAL DATE <br /> PROJECTED <br /> 1/302014AT F� � <br /> Step to Resolve Impediment 1 - Step 3: - DELETE STEP - J <br /> COMPLETION GATE <br /> r <br /> sufficient moluto q o characters p PROJECTED DATE nn t characterize lame <br /> ACNAL DATE <br /> 3/,10/2015 _ j <br /> Step to Resolve Impediment 1 - Step 4: - DELETE STEP <br /> COMPLETION GATE <br /> p. a and submit a conceptual model. ACTUALDATE <br /> PROJECTED <br /> 9/3N2014AT I I <br /> ADO ADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> General Criteria F: Secondary source has NOT been removed to the extent practicable F Procedural Impediment - I_ <br /> Slop to Resolve Impediment 2-Step 1: -DELETE STEP <br /> COMPLETION DATE <br /> co <br /> ptual site model demonstrates a need for reencliation, prepare a corrective action plan. <br /> ACTUAL DATE <br /> PROJECTED12J302014p� F <br /> Step W Resolve Impediment 2 - Step 2: - DELETE STEP <br /> COMPLETION DATE <br /> r <br /> te a thirty- y public participation period. <br /> PROJECTED DATE ACTUAL DATE <br /> 2115/2015 <br /> Step to Resolve Impediment 2 - Step 3: -ELLEN STEP <br /> COMPLETION DATE <br /> D,Mlement a p of study, if needed, or corrective action plan or remedlal action plan. <br /> PROJECTED ACTUAL ACAL GA <br /> 11/30.2016 <br /> ADDADDITIONALSTEP <br /> IMPEDIMENT 3: <br /> Media-Specific Criteria: Groundwater: The contaminant plume that exceeds water quality objectives is ❑ Procedural Impediment • INFO <br /> NOT stable or decreasing in areal extent, and does NOT meet all of the additional characteristics of one of <br /> the five classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> • Plume Length (That Exceeds Water Quality Objectives): Unknown <br /> Plume is Stable or Decreasing in AREAL Extent: Unknown <br /> • Free Product in Groundwater: Unknown <br /> • Free Product Has Been Removed to the Maximum Extent Practicable: Unknown <br /> • Free Product Extends Offsite: Unknown <br /> • Benzene Concentration: >_ 31000 jig/[ <br /> • Nearest Supply Well (From Plume Boundary): Unknown <br /> Step to Resolve Impediment 3 - Step 1 : - DELETE STEP COMPLETION DATE <br /> conduct sufficient monitoring to chararcterize the plume and complete the site I PROJECTED <br /> ACTUA <br /> AE <br /> 3(30/2015aT <br /> Step to Resolve Impediment 3 - Step 2: - DELETE STEP <br /> COMPLETION DATE <br /> omplete a sensitive receptor survey <br /> ' TE GATE <br /> PROJECTED DAACTUAL <br /> N302014 <br /> https:Hgeotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=T... 10/28/2013 <br />