Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
I <br />� Menillin Real Estate i nostme <br /> e e <br /> Step toResolve lmp tlim nt 3 - Step 3 - <br /> DELETE STEP <br /> p e a conceptual site model . COMPLETION DATE <br /> PROJ <br /> ECTED 2014ATE ACNALDATE <br /> 913012m4 I F�j <br /> Step to Resolve Impediment 3 - Step 4: - DELETE STEP <br /> the <br /> conceptual site model demonstrates a need for remearazt prepare. a corrective action plan- COMPLETION DATE <br /> PROJECTED ACTUALDATE <br /> _ 12rJ012014 � <br /> Step to Resolve Impediment 3 - Step 5: - DELETE STEP <br /> COMPLETION DATE <br /> to a <br /> thirty-day p l participation period. PROJECTED DATE �ACTUAL DATE <br /> x1512015 _ . I <br /> S WResolve Impediment 3 - Step 6: - DELETE STEP <br /> COMPLETION DATE <br /> Implement a pilot study or corrective action plan/remedial action Plan. <br /> PROJECTED GATE �TUAL GATE <br /> 12130.@018 _ I <br /> ADD ADDITIONAL STEP <br /> IMPEDIMENT 4: <br /> Media Specific Criteria: Petroleum Vapor Intrusion to Indoor Air. The site is NOT considered low-threat for ❑ Procedural Impediment - INFO <br /> the vapor-intrusion-to-air pathway and site-specific conditions do NOT satisfy items 2a, 2h, or 2c . <br /> Conditions that do not meet the policy criteria: <br /> • Soil Gas Samples: No Soil Gas Samples <br /> • Exposure Type: Commercial <br /> • Free Product: Unknown <br /> • TPH in the Sioattenuation Zone: >_ 100 mg/kg <br /> • Bioattenuation Zone Thickness: 2 5 Feet and < 10 Feet <br /> • 02 Data in Bioattenuation Zone: No 02 Data <br /> • Benzene in Groundwater: >_ 1 ,000 pg/I <br /> • Sol] Gas Benzene: Unknown <br /> • Soil Gas EthylBenzene: Unknown <br /> • Soil Gas Naphthalene: Unknown <br /> Step to Resolve Impediment 4 - Step 1: - DELETE STEP <br /> COMPLETION UAIE <br /> omplete site assessment that includes collection of data pertinent to vaporintrusion evaluation- <br /> PROJECTED <br /> ROJ DATE LNALDATE <br /> GI30I2012014 <br /> Step to Resolve Impediment 4- Step 2: - DELETESTEP <br /> COMPLEr10N DATE <br /> repare a con p <br /> site model. <br /> PROJECTED ATE ACTUALDAM <br /> MM014 . <br /> Step to Resolve Impedirent 4 -Step 3: -DEIJT ESTEP COMPLETION DATE <br /> ON <br /> uct such remediation a appropriate to mitigate vapor intrusion risk and hazard.a <br /> PROJECTED DATE ACTUALDA <br /> i1x3012m6 <br /> ADO ADDITIONAL STEP <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> PUBLIC WELL <br /> DATE IDENTIFIED RPNOTIFICATION PARTICIPATION DESTRUCTION WASTE DISPOSAL LAND USE SITE CLOSURE <br /> FORCLOSURE CLOSUREINITI�ATEDBY -I DATE COMPLETION DATE DATE DATE RESTRICTION DATE DATE <br /> Save in Progress Save as Final <br /> LOGGED IN AS MCCARTNE CONTACT GEOTRACKER HELP <br /> https ://geotracker.waterboards.ca.gov/regulators/screens/closure_policy.asp?global_id=T. . - 10/28/2013 <br />