14 October 2014 <br /> AGE Project No , 11 - 1847 <br /> Page 5 of 6 <br /> 3 . 2 . WELL COMPLETION AND ELEVATION SURVEY <br /> Adjacent to each deep soil boring , a second pilot soil boring will be advanced to a depth <br /> of approximately 40 feet bsg and completed as a groundwater monitoring well utilizing a <br /> 2-inch diameter, Schedule 40 PVC blank well casing and 0 . 020-inch slotted well screen <br /> installed from 20 feet to 40 feet bsg ; soil samples will not be collected during pilot soil <br /> boring advancement. A diagram of the proposed monitoring well construction is <br /> depicted in Figure 4 . <br /> After installing the well casing in each pilot boring , a filter pack material consisting of <br /> pre-washed #3 Lonestar sand will be added through the augers from total depth to <br /> approximately 2 feet above the screened interval . Following placement of the filter pack, <br /> the well will be surged to assist in settling the filter pack . Additional sand will be added if <br /> settling occurs . <br /> A three-foot bentonite seal will be placed above the filter pack to minimize the potential <br /> for grout penetration into the screened section of the wells . The bentonite seal will be <br /> formed by pouring bentonite chips into the annulus and allowing them to settle on the <br /> filter pack. The bentonite chips will be allowed to hydrate for the duration of time <br /> specified by the manufacture , prior to grouting . The remaining annular space will be <br /> filled to within one foot of the ground surface with a cement grout. The grout mixture will <br /> consist of Type 1/11 portland neat cement and not more than 3 gallons of water per 50- L<7 J5 <br /> pound sack of cement. The grout will be placed by pouring or pumping through a tremie <br /> pipe or auger. A grouting inspection will be scheduled with EHD personnel prior to any <br /> application of grout. <br /> Following completion of the monitoring wells , each well location will be surveyed at the <br /> top of each well casing by a California-licensed surveyor relative to a City of Stockton <br /> benchmark and the North American Vertical Datum 88 . <br /> 3 . 3 . WELL DEVELOPMENT <br /> Development of the proposed wells will consist of a combination of bailing with a <br /> stainless steel bailer to remove the major portion of fine-grained sediment from inside <br /> the well , surging to flush out or draw in sediment from the filter pack , and additional <br /> groundwater evacuation with a Waterra inertia pump to finish the removal of fine- <br /> grained sediment . Developmental purging activities will be continued until field <br /> parameters (pH , electrical conductivity , and temperature) have stabilized and purged <br /> water is visually sediment-free . <br /> Advanced GeoEnviron rental Inc. <br />