Laserfiche WebLink
p 14 October 2014 <br /> AGE Project No . 11 - 1847 <br /> Page 6 of 6 <br /> 3 .4 . GROUNDWATER SAMPLING PROCEDURES <br /> Groundwater sample collection will be performed in accordance with AGE 's standard <br /> monitoring and sampling procedures , which have been included as Appendix B . <br /> 3 . 5 . EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br /> All sampling tools will be thoroughly rinsed with clean water after being washed with a <br /> solution of Alconox. All down-hole drilling equipment will be pressure washed prior to <br /> starting each boring . Rinseate and soil cuttings generated during drilling and <br /> groundwater sampling activities will be containerized in properly labeled , Department of <br /> Transportation ( DOT)-approved 55-gallon drums and stored on-site in an area lacking <br /> public access . Disposal alternatives will be evaluated based on the results of soil <br /> analysis . <br /> I <br /> J <br /> 1 <br /> Advanced Geo6nvironmental Inc, <br /> Ij <br />