My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2154
>
2900 - Site Mitigation Program
>
PR0541437
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:16:10 AM
Creation date
7/24/2019 11:10:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541437
PE
2965
FACILITY_ID
FA0023751
FACILITY_NAME
MCBILLIN PROPERTY
STREET_NUMBER
2154
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16705021
CURRENT_STATUS
01
SITE_LOCATION
2154 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 September 2012 <br /> AGE Project No. 11 - 1847 <br /> Page 8 of 9 <br /> r <br /> 3 .4 . WELL DEVELOPMENT AND SURVEY <br /> Development will consist of a combination of bailing to remove the major portion of fine- <br /> grained sediment from inside the well , surging to flush out or draw in sediment from the <br /> filter pack, and additional bailing to finish the removal of sediment. Development activities <br /> will be continued until field parameter (pH , electrical conductivity, and temperature) <br /> readings have stabilized . Additionally, each well head elevation and GPS location <br /> coordinate will be surveyed by a licensed surveyor. <br /> k <br /> k 3 .5 . GROUNDWATER SAMPLING PROCEDURES <br /> Y <br /> Groundwater sample collection will be performed in accordance with the CVRWQCB <br /> guidelines and sampling protocols (Tri-Regional Water Quality Control Board <br /> Recommendations for Preliminary Investigations and Evaluation of Underground Storage <br /> r Tanks) . <br /> I <br /> 3 .5 . 1 . Static Water Level Measurements <br /> i. <br /> Before purging and sampling during groundwater monitoring events, static water level will <br /> be measured using a Solist water level meter. Water level data will be recorded to the <br /> nearest 0 . 01 -foot from a reference point marked of the top of the PVC well casing . Before <br /> and after each use, the electric water level indicator will be washed in an Alconox solution <br /> and rinsed with water. <br /> 3 .5 .2 . Well Evacuation <br /> Subsequent to measurement of depth to water and prior to sampling , wells will be purged <br /> using a using a disposable polyethylene bailer or dedicated Teflon tubing used in <br /> conjunction with a Waterra inertial pump. To ensure groundwater samples are <br /> representative of the formation, rather than water standing in the well casing , wells will be <br /> purged until : 1 ) a minimum of three casing volumes is removed from the well ; and/or 2 ) the <br /> field-measured groundwater parameters pH , temperature and electrical conductivity have <br /> stabilized . However, if a well is purged dry prior to evacuating three casing volumes, a <br /> groundwater sample will be collected following 80 percent recovery of groundwater level <br /> within the well or within 8-hours of well evacuation . <br /> Purge water, free-product, and decontamination water generated during the groundwater <br /> sampling activities will be contained in DOT-approved drums which will be appropriately <br /> Advanced CeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.