My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2154
>
2900 - Site Mitigation Program
>
PR0541437
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:16:10 AM
Creation date
7/24/2019 11:10:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541437
PE
2965
FACILITY_ID
FA0023751
FACILITY_NAME
MCBILLIN PROPERTY
STREET_NUMBER
2154
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16705021
CURRENT_STATUS
01
SITE_LOCATION
2154 S EL DORADO ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> 10 September 2012 <br /> AGE Project No. 11 - 1847 <br /> Page 9 of 9 <br /> labeled for storage. Drums containing purge waterwill be stored on-site pending appropriate <br /> removal and disposal . <br /> 3 .5 . 3. Sample Withdrawal <br /> Water samples will be collected from the monitoring well using a disposable polyethylene <br /> bailer or dedicated Teflon tubing used in conjunction with a Waterra inertial pump . Bailers <br /> are disposed of after one use, requiring no decontaminating and Teflon tubing used with <br /> the inertia pump is either dedicated to each well or changed at each sampling event, <br /> thereby minimizing cross contamination due to sampling devices . Samples will be drawn <br /> and collected in such a manner that agitation and exposure of the groundwater to the <br /> atmosphere are minimal . <br /> 3 . 5 .4 . Sample Handling <br /> ii Groundwater samples will be collected into laboratory supplied containers. Groundwater <br /> samples to be analyzed for constituents listed in Section 2. 3 . Samples will be collected into <br /> laboratory-supplied 40-ml VOA vials without sample preservative . Following collection , <br /> samples will be placed on ice and kept in a cooler until delivered to the laboratory for <br /> analysis . Chain of custody protocols will be used to document sample custody transfer from <br /> the field to the analytical laboratory. A chain of custody form will accompany the samples. <br /> 3 . 6 . EQUIPMENT DECONTAMINATIONMASTE MANAGEMENT <br /> All sampling tools used for sample collection , except for disposable bailers, will be <br /> thoroughly rinsed with clean water after being washed with a solution of Alconox. All down- <br /> hole drilling equipment will be pressure washed prior to starting each boring . Cuttings <br /> generated during drilling and rinseate generated during drilling and groundwater sampling <br /> activities will be containerized in properly labeled DOT-approved 55-gallon drums , and <br /> stored on-site in an area lacking public access . Disposal alternatives will be evaluated <br /> based on results of soil and water analysis. <br /> Advanced CeuEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.