Laserfiche WebLink
;i Ali-if' <br /> [[ r <br /> GeologicafTechnics Inc. � „nv 1 -7 p,, 1* 20 <br /> 2741 River Road <br /> Modesto,California 95351 <br /> (209)538-6424/FaX#538-5852 <br /> May 13, 1999 <br /> Project No.: 723.2 <br /> Project Name: Valentine (El Dorado St.) <br /> Mr. Jim Munch <br /> State Water Resources Control Board <br /> 2014 T Street,'Suite 130 <br /> P.O. Box 944212 <br /> Sacramento, CA 94244-2120 <br /> RE: Cost Pre-Approvalfor Site Characfe"rizati6n Work <br /> Location: 2315 N. El Dorado St., Stockton, CA <br /> County Site Code: 9401; USTCFP Claim#012607 <br /> Dear Mr. Munch: <br /> In a letters from San Joaquin County, dated March 16, August 3 and November 6, 1998, Mr. Jeff <br /> Wong requested that the vertical extent of soil and groundwater contamination be defined on the <br /> property located at 2315 N. El Dorado St., Stockton,.California. <br /> It should be noted that Jeff Wong changed the scope of work three times as to the method of <br /> defining the vertical extent of groundwater contamination. We ultimately arrived at Addendum <br /> #2. <br /> Summary of Current Corrective Action Work <br /> 1. On October 29, 1998, Geological Technics prepared a work plan to perform vertical <br /> definition investigative work. <br /> 2. In January 1999, Mr. Wong requested, by phone, that an addendum to the work plan be <br /> prepared that included a nested pair of deep discretely screened monitoring wells. <br /> 3. January 13, 1999 GTI submitted an addendum to the October 29, 1998 work plan describing <br /> the construction of the nested well pair. <br /> 4.- :In a February 4,-1999-letter-;-Mr.-Jeff Wong asked-for,an additional Addendum to-the October --- �� <br /> 29, 1998 Site Characterization Work Plan, which modified the well construction. <br /> 5. On February 15, 1999, GTI prepared a second addendum describing the modified <br /> construction of these two wells. <br /> During, the course of the iterations taken to achieve approval of the work plan by the County <br /> inspector, GTI spent some considerable time on the phone with Jeff Wong and prepared two <br /> addendum's revising the method of drilling and sampling and the construction of the monitoring <br /> wells. <br /> Since this was taking so long, GTI performed a groundwater monitoring of the existing wells. <br /> This work is not included in the enclosed budget for future work, but will be included in the <br /> reimbursement request the Mr. Valentine will prepare. <br />