My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:47:13 AM
Creation date
7/24/2019 11:27:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geologicaf7echnics Inc. %WWI N+R' Page 2 <br /> Valentine <br /> Project No.: 723.2 <br /> May 13, 1999 <br /> Copies of the work plan and addendum's to the Work Plan, SJC PHS/EHD correspondence, <br /> groundwater monitoring reports, drilling bids and an itemized budget spread sheet of costs for <br /> performing this work are enclosed for your review. <br /> Proposed Direction of Project <br /> The work approved by the County is summarized below: <br /> 1. Drill and install one deep soil boring and collect four SimulProbe samples to a depth of 110 <br /> feet bgs. Install a short discretely screened monitoring well near the depth of 110 feet. <br /> 2. Drill and install a second deep aquifer monitoring well with a short discretely screened near <br /> the depth of 90 feet. <br /> 3. Analyze four soil and pore-water SimulProbe samples for the following: <br /> • Benzene,toluene, ethylbenzene and xylene (BTEX)by EPA method 8020/602. <br /> • Gasoline range petroleum hydrocarbons (TPH-Gas) by EPA method 5030/8015(m). <br /> • Methyl Tertiary Butyl Ether(MTBE)by EPA method 8020. <br /> • In addition, two soil and two pore-water samples will be analyzed for the fuel oxygenate <br /> suite (MTBE, DIPE, ETBE, TAME& TBA)by EPA method 8260. <br /> 4. Develop the new monitoring wells. <br /> 5. Place the two new wells on a quarterly monitoring schedule with the other eight monitoring <br /> wells for a period of one year. Include two monitoring events for testing water samples for <br /> the oxygenated fuel compounds by 8260 and dissolved oxygen and oxidation-reduction <br /> potential. Costs in the budget are estimated for one year. <br /> 6. Prepare a site characterization report after well installation and initial monitoring. <br /> 7. Prepare three groundwater monitoring reports. <br /> Listed below is a proposed schedule for implementing this project. <br /> Proposed Bidding of Project <br /> To remain in compliance with the USTCFP, Geological Technics Inc. requested a bid from <br /> V&W Drilling to drill and install three groundwater monitoring wells, one deep soil boring and <br /> five shallow soil borings. GTI has found V&W to be very cost effective because they have <br /> reasonable charge rates, have fast drilling equipment, and are well trained. <br /> A bid from SimulProbe is also included. <br /> These costs have been included in the attached opinion of cost spreadsheet prepared giving <br /> estimated costs for performing the work approved by SJC. The opinion of cost spreadsheet <br /> shows itemized cost for the tasks proposed. In an attempt to make this Pre-Approval flow <br /> smoothly, GTI has used the same unit costs for this work that has previously been approved by <br /> the USTCFP for other projects. <br /> Geological Technics Inc. accepts field support services and lab invoices and adds a 15% <br /> overhead fee. GTI then pays these charges. Construction contractors will invoice you directly <br /> since Geological Technics Inc. is not a licensed contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.