My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 11:41:49 AM
Creation date
7/24/2019 11:34:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological re"cs/Kc. <br /> Valentine Property <br /> Project No.:723.2 n <br /> Well Destruction Work Plan - - <br /> t <br /> December 10;2012 <br /> A neat cement grout(containing less'than o bentonite)will be pumped under pressure <br /> through a tremie pipe.to the bottori of th well. .In,this manner, the grout will displace . . <br /> the water in the well ensuring that it is 'o pletely filled with grout. <br /> • After the grout has been filled to Neto of the well, a pessure cap will be fitted to the <br /> casing and the well pre§surized.to,�25 si. If the grout settles, additional grout will.be <br /> pumped into the-well casing. This will.force the cement into the filter pack. <br /> • .The amount of eeinent grout.volume needed.td,fill the well and the horizontal piping has <br /> been calculated (attached'tables) and the amount 'utilized will "be tracked to judge the ; <br /> effectiveness of-the process. ' <br /> • After the grout has been installed,' the top of casing of the three monitoring wells will be <br /> drilled out to a depth of 5 ft below grade and the holes will be filled.with clean dirt and <br /> capped with asphalt or concrete in.the upper 8 inches below grade for wells in asphalted <br /> or concrete areas(respectively): The other,.12 various wells will be drilled out. � � 1 <br /> Remedial Equipment Removal. i <br /> Prior to well destruction,Geological"Technics Inc. will remove of all remediation equipment Sci <br /> and security fencing. a <br /> Schedule,&Reporting ' <br /> Our goal is to complete the well abandonment work.by mid February 2013, contingent upon <br /> Work Plan approval. <br /> The information gathered during this phase of work will be presented.in a report, which will <br /> include a discussion of well destruction efficiency(grout volume utilized versus.calculated i <br /> expectations). <br /> The project will be supervised by:Pn.•Ray Kablanow; the registered professional geologist ; <br /> responsible for the work. Copies of the reports will be forwarded'to 'both the appropriate <br /> .County and State regulatory.'agencies. <br /> If you should have any questionsplease do riot hesitate to call. <br /> Respectfully Submitted, ' <br /> itali signed Ra noldKablanow ��NAL G <br /> 9 Y y Y Y . � FQ`Q <br /> Ra N:cn=Raynold Kahlanow,o, <br /> i=Genf 'cal Tech <br /> `•,. <br /> e -ail-gti@gti v.c a" IiAYNOLD <br /> KaTb -4 �o a KAB�allow �+ <br /> G <br /> Raynold t Kablanow ll,Th.D. No:5234California Professional • <br /> �j, •31-N �Q <br /> Certified Hyd ogeoiogi t#442 #5234 <br /> Geologist 9�F0r CA1.���¢� <br /> cc: Harlin Knoll—SJC EHD <br /> Mike Smith-CRWQCBCVR <br />
The URL can be used to link to this page
Your browser does not support the video tag.