Laserfiche WebLink
Lir � �•+� <br /> TABLE OF CONTENTS <br /> Lt 1.0 INTRODUCTION <br /> 2.0 PURPOSE AND GOALS OF REMEDIAL ACTION <br /> L 3.0 INTERIM SOIL & GROUNDWATER REMEDIATION <br /> 3.1 Source Removal <br /> 3.1.1 Extraction Wells EW-1,VEW-1 & VEW-2 <br /> 3.1.2 Treatment System—Dual Phase High Vacuum Extraction <br /> 3.1.2.1 Vapor Treatment- Thermal Oxidation <br /> 3.1.2.2 Groundwater Treatment—Air stripping with carbon <br /> filtration of vapor/water effluents <br /> 3.1.3 System Operation & Monitoring <br /> 3.1.3.1 Vapor Monitoring/Sampling Procedure <br /> 3.1.3.2 Water Monitoring/Sampling Procedure <br /> 3.2 Plume Control <br /> 3.2.1 Extraction Well <br /> 3.2.1.1 Soil Boring <br /> 3.2.1.2 Soil Sampling <br /> 3.2.1.3 Soil Laboratory Analysis <br /> 3.2.1.4 Extraction Well Installation <br /> 3.2.1.5 Well Development <br /> j 3.2.2 Groundwater Treatment—Air stripping with carbon filtration of <br /> L+ vapor/water effluents <br /> 3.2.3 System Operation &Monitoring <br /> G4.0 ASSESSMENT OF REMEDIAL EFFECTIVENESS <br /> 4.1 Source Removal <br /> 4.2 Plume Control <br /> 5.0 SCHEDULE& REPORTING <br /> 5.1 Final Corrective Action Plan <br /> 5.2 Proposed Schedule of Work <br /> 6.0 SIGNATURES AND CERTIFICATION <br /> 4� <br />