Laserfiche WebLink
GeologicaITechnicsInc. <br /> Page 14 <br /> Interim Remedial Action Plan <br /> Project No.723,2 <br /> March 7,2005 <br /> 6.0 SIGNATURES AND CERTIFICATION <br /> It is expected that this project will be performed in accordance with current professional <br /> standards and accepted geologic and hydrologic standards of the State of California accepted <br /> and in effect at the time.of this investigation. Geological Technics Inc. is not responsible for <br /> undisclosed conditions. <br /> This work plan was prepared by: <br /> f <br /> Joseph/ .' Angulo <br /> Geologist �S�Q NA G�c <br /> at 4IIAB �O <br /> oIA 1� <br /> No 5234 <br /> Raynold L°Kablanow II, Ph.D. <br /> California Professional Geologist.#5234 <br /> California Certified Hydrogeologist#442 CAS-I <br /> i <br /> I <br /> Fill ` <br /> f <br />