My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008506
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0008506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:10:37 PM
Creation date
7/24/2019 11:41:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008506
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
described, the ends promptly covered with foil or teflon tape , <br /> covered with plastic end caps , sealed with duct tape, labeled, & <br />' placed on ice pending transport to FGL Environmental laboratory <br /> 6 Drill cuttings & unused core material will be placed in <br />' suitable metal drums , properly sealed and labeled, and stored on <br /> site pending results of the laboratory analysis <br />' 7 Upon completion of operations , the hole will be grouted from <br /> bottom to the surface with a cement/bentonite slurry by use of a <br /> flexible hose or tremae pipe as directed by a representative of <br />' the County EHD <br /> 8 The preserved soil samples will be transported on ice under <br /> chain of custody to FGL laboratory with instructions to analyze <br /> for motor oil , (W E T [STLC] - waste oil , ) using detection <br /> limits as approved by the San Joaquin County EHD <br />' After reviewing field work & analyzing the laboratory analyzes , a <br /> report will be prepared and submitted to the County EHD for <br /> review and comment <br /> Due to scheduled vacation & other active projects , it will not be <br /> possible to schedule this work until late September or early <br /> October, depending on rig availability The San Joaquin County <br />' EHD office will be notified at least 48 hours prior to commence- <br /> memt of operations <br /> WmJ n er & Associates <br /> Augu t 7 , 1994 <br /> cc S Valentine <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.