My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008506
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0008506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:10:37 PM
Creation date
7/24/2019 11:41:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008506
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> TABLES <br />' TABLE I LABORATORY RESULTS OF SOIL SAMPLES TAKEN AFTER REMOVAL <br /> OF GASOLINE UST' S <br /> TABLE II LABORATORY RESULTS OF SOIL SAMPLES TAKEN FROM BENEATH <br /> REMOVED WASTE OIL TANK <br /> TABLE III LABORATORY RESULTS OF SOIL SAMPLE TAKEN 6/15/1987 FROM <br /> BELOW SITE OF WASTE OIL TANK <br />' TABLE IV LABORATORY RESULTS OF SOIL SAMPLE TAKEN 8/14/1987 AT <br /> 13 1/2 FEET BELOW SITE OF WASTE OIL TANK <br /> TABLE V LABORATORY RESULTS OF TESTS FOR BTEX & TPH OF SOIL <br /> SAMPLES TAKEN OCTOBER 27 & 28, 1993 <br />' TABLE VI LABORATORY RESULTS OF TESTS FOR Ca, Cr, Pb, Ni, & Zn <br /> OF SOIL SAMPLES TAKEN OCTOBER 27 & 28, 1993 <br /> TABLE VII LABORATORY RESULTS OF TEST FOR CHLORONATED SOLVENTS, <br />' (EPA 8010, ) OF SOIL SAMPLES TAKEN OCT. 27 & 28, 1993 <br /> TABLE VIII LABORATORY RESULTS OF SOIL SAMPLES TAKEN SEPTEMBER 30, <br /> 1994 DURING PLACEMENT OF MONITORING WELL <br /> TABLE IX LABORATORY RESULTS OF WATER SAMPLES TAKEN OCTOBER 3, <br />' 1994, AFTER COMPLETION OF MONITORING WELL <br /> EXHIBITS <br /> EXHIBIT A CORRESPONDENCE, EHD/VALENTINE, DTD FEB. 28, 1994 <br />' EXHIBIT B WJH WORKPLAN FOR SOIL BORING, DTD AUG. 17 , 1994 <br /> EXHIBIT C WJH ADDENDUM DATED 10/1/1994 TO 8/17/94 WORKPLAN <br /> EXHIBIT D DEL-TECH FIELD REPORT DATED 10/3/1994, COVERING WELL <br />' DEVELOPMENT, PURGING & SAMPLING <br /> EXHIBIT E LABORATORY REPORTS & CHAIN OF CUSTODY, SOIL SAMPLES <br /> TAKEN 9/30/1994 <br /> EXHIBIT F LABORATORY REPORTS & CHAIN OF CUSTODY, WATER SAMPLES <br />' TAKEN 10/3/1994 <br /> EXHIBIT G SURVEYORS' FIELD REPORT OF WELLHEAD ELEVATION <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.