Laserfiche WebLink
1 <br /> 1 <br /> TABLES <br />' TABLE I LABORATORY RESULTS OF SOIL SAMPLES TAKEN AFTER REMOVAL <br /> OF GASOLINE UST' S <br /> TABLE II LABORATORY RESULTS OF SOIL SAMPLES TAKEN FROM BENEATH <br /> REMOVED WASTE OIL TANK <br /> TABLE III LABORATORY RESULTS OF SOIL SAMPLE TAKEN 6/15/1987 FROM <br /> BELOW SITE OF WASTE OIL TANK <br />' TABLE IV LABORATORY RESULTS OF SOIL SAMPLE TAKEN 8/14/1987 AT <br /> 13 1/2 FEET BELOW SITE OF WASTE OIL TANK <br /> TABLE V LABORATORY RESULTS OF TESTS FOR BTEX & TPH OF SOIL <br /> SAMPLES TAKEN OCTOBER 27 & 28, 1993 <br />' TABLE VI LABORATORY RESULTS OF TESTS FOR Ca, Cr, Pb, Ni, & Zn <br /> OF SOIL SAMPLES TAKEN OCTOBER 27 & 28, 1993 <br /> TABLE VII LABORATORY RESULTS OF TEST FOR CHLORONATED SOLVENTS, <br />' (EPA 8010, ) OF SOIL SAMPLES TAKEN OCT. 27 & 28, 1993 <br /> TABLE VIII LABORATORY RESULTS OF SOIL SAMPLES TAKEN SEPTEMBER 30, <br /> 1994 DURING PLACEMENT OF MONITORING WELL <br /> TABLE IX LABORATORY RESULTS OF WATER SAMPLES TAKEN OCTOBER 3, <br />' 1994, AFTER COMPLETION OF MONITORING WELL <br /> EXHIBITS <br /> EXHIBIT A CORRESPONDENCE, EHD/VALENTINE, DTD FEB. 28, 1994 <br />' EXHIBIT B WJH WORKPLAN FOR SOIL BORING, DTD AUG. 17 , 1994 <br /> EXHIBIT C WJH ADDENDUM DATED 10/1/1994 TO 8/17/94 WORKPLAN <br /> EXHIBIT D DEL-TECH FIELD REPORT DATED 10/3/1994, COVERING WELL <br />' DEVELOPMENT, PURGING & SAMPLING <br /> EXHIBIT E LABORATORY REPORTS & CHAIN OF CUSTODY, SOIL SAMPLES <br /> TAKEN 9/30/1994 <br /> EXHIBIT F LABORATORY REPORTS & CHAIN OF CUSTODY, WATER SAMPLES <br />' TAKEN 10/3/1994 <br /> EXHIBIT G SURVEYORS' FIELD REPORT OF WELLHEAD ELEVATION <br /> 1 <br />