Laserfiche WebLink
' CeoCogtcal7echitus Inc • Page 6 <br /> Valentine(Castle Motors) <br /> Vertical Def WP <br /> August 23,2000 <br /> ' 3.0 SCHEDULE & REPORTING <br /> ' Geological Technics Inc anticipates beginning fieldwork no later than 30 days after work <br /> plan approval, cost pre approval from the Fund and upon issuance of the drilling permit The <br /> information gathered during this phase of work will be presented in a report that will include <br /> a summary of the geology as well as the results of sample analyses Dr Ray Kablanow, a <br /> Registered Geologist and Certified Hydrogeologist, will supervise the project Copies of the <br /> report will be forwarded to both the appropriate County and State regulatory agencies <br /> (SODER and CRWQCB) <br /> 4.0 SIGNATURE AND CERTIFICATION <br />' This project will be performed by Geological Technics Inc in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br />' of this investigation Geological Technics Inc is not responsible for undisclosed conditions <br /> This work plan was prepared by <br /> aaV`A J <br /> Joseph ID JAr1gulo <br /> Geologiw rSS1O0 <br /> �� RI KwH p <br /> N <br />' OL No 5234 � <br /> Raynold I Kablanow 11, Ph D * •of(.o <br /> California Registered Geologist#5234 <br /> Certified Hydrogeologist#442 C3F CAu�0. <br /> 1 <br /> 1 <br />