My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0008530
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0008530
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:04:19 PM
Creation date
7/24/2019 11:43:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008530
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5) Results of laboratory analysis of groundwater samples from MW-1 indicate Benzene at <br /> 1100 parts per billion (ppb) The Maximum Contaminant Level for Benzene in drinking <br /> water is 1 ppb The cleanup level for Benzene under the Central Valley Regional Water <br /> Quality Control Board (CVRWQCB) basin plan is background When the lateral extent <br /> of the groundwater plume has been defined, remediation of the groundwater plume may <br /> begin <br /> PHS/EHD recommends installation of 2 additional monitoring wells to determine gradient and <br /> the extent of the groundwater plume Soil data from the monitoring wells may provide <br /> additional data to define the extent of soil contamination from 36 feet to groundwater <br /> In order to remain in compliance with Article 11 of the Caltfonua Code of Regulations (CCR <br /> Article 11), the corrective action regulations, a workplan for the installation of two additional <br /> monitoring wells shall be submitted to PHS/EHD by March 30, 1995 Quarterly monitoring of <br /> the monitoring wells shall continue until the site receives closure status Failure to remain in <br /> compliance with CCR Article 11 may jeopardize the status of your reimbursement <br /> For further information please contact Steven Sasson at (209) 468-3459 <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Steven Sasson, Senior REHS Diane M Hinson, REHS <br /> Site Mitigation Unit Supervisor <br /> SS <br /> cc Elizabeth Thayer, CVRWQCB <br /> f� Barbara Andersen, SWRCB <br /> V cc Bill Hunter, W 3 Hunter and Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.