Laserfiche WebLink
of bentonite pellets was placed on top of the sand, and wetted <br /> with water The top of the bentonite was located at 30 ' bgl with <br /> a weighted tape The casing was cut off slightly below ground <br /> level and covered with a metal plate to prevent entry of surface <br /> materials Refer to PLATE IX for details of the well completion <br /> 1 Soil samples were taken at 5 ' intervals from 15 ' bgl to 50 ' bgl <br /> in soil boring "D" (MW-4 ; ) refer to PLATE V for details of <br /> recovery, blow counts, lithology, etc . After retrieving the last <br /> core, the augers were advanced to 55 ' bgl , and casing was run and <br /> sand-packed as described above . Refer to PLATE VIII for details <br />' of the well completion <br /> After completion of Monitoring well #5, and cleaning the augers & <br /> core barrels, the rig was repositioned on the location marked for <br /> t soil boring "B" (PLATE III, ) which was adjacent to the site of <br /> the removed dispensing pumps Drilling began at about 1300 <br /> hours, and the first core was taken from 101 -1116" . The core was <br /> handled, described, screened, and preserved using field proce- <br /> dures given earlier Additional cores were taken at 5 ' intervals <br /> from 15 ' bgl to 50 ' bgl , refer to PLATE IV for details Obvious <br /> petroleum contamination was noted in all cores from 15 ' to 511611 , <br /> with PID readings in excess of 2 , 000 ppm in core material from <br /> 25 ' bgl to 4616" The augers were advanced to 55 ' bgl , but no <br /> additional cores were taken . Since this soil boring was not to <br /> be converted to a monitoring well, it was grouted with a cement/ <br /> bentonite mixture from bottom to the surface by use of a flexible <br /> hose <br />' After completion of MW-4, the rig was repositioned on the spot <br /> marked for soil boring "A" (MW-6) as shown on PLATE III . <br /> Drilling began at 1400 hours, and the first core was taken from <br />' 251 -2616" It was handled by field procedures described earlier. <br /> Additional cores were taken at 5 ' intervals from 30 , bgl to 4616" <br /> bgl ; refer to PLATE VII for details Augers were advanced to 55 ' <br /> bgl for completion 2" OD Schedule 40 blank and slotted casing <br /> was landed at 551 ; 020" slotted screen extended from 55 ' to 35 ' <br /> bgl, with blank casing to the surface. The well was sand-packed <br /> and completed in the same manner as the other 2 ; details are <br />' given on PLATE X. After grouting soil boring "B" , the three wells <br /> were grouted from the bentonite seals to the surface with cement <br /> slurry displaced with a flexible hose . Each well was fitted with <br /> a preformed vault which was thoroughly cemented in place; casings <br /> extended approximately 6" into the vault, and were fitted with <br /> expandable locking seals . Each vault was covered with a traffic <br />' cover to prevent damage Containerized drill spoils were stored <br /> on site pending appropriate disposal <br /> 1 6 <br />