Laserfiche WebLink
' <br /> Final Results - Limited Phase II Environmental Site Assessment Page 3 <br /> Proposed El Dorado Apartments Development <br /> ' Stockton, California <br /> CTE Job No. 20-1232 <br /> May 23, 2002 <br /> currently being analyzed for Polychlorinated Biphenyls(PCBs)by EPA Method 8082;analyses results <br /> will be transmitted at a later date. <br /> Research conducted for the Phase I ESA portion of this project did not indicate any possible nearby <br /> offsite facilities that might be the source of the observed TPH contamination;therefore it is presumed <br /> that the observed contamination is originating onsite. However, specific details on the exact location <br /> of the contaminant source are unknown. <br /> ' CONCLUSIONS AND RECOMMENDAITONS <br /> In conclusion, we recommend additional site investigation activities to further define the extent and <br /> source of this contamination. Prior to any additional activities,the PHS/EHD should be contacted so <br /> that the site can be placed into the Local Oversight Program (LOP) and that future activities can be <br /> overseen by the appropriate regulatory agency. This is the responsibility of the owner. <br /> If you have any questions about this report, please do not hesitate to contact this office. <br /> ' Respectfully submitted, <br /> Jonat an Goodmacher, REA II, RG 46143 Steven S. Teel, C.HG 476' <br /> ' Chief Geologist Senior Hydrogeologist <br /> iz- �1 AnOC <br /> N <br /> No.`6I 143 <br /> ` A ) 1 ') C Q <br /> M AGI Q' <br /> �F C A1-\Fo <br /> ETrojects Tracy 011ice (20-0000)\20-1232\1;1'F2_Phase 11 rinal.doc <br />