My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:47:59 AM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q <br /> preparation of a request for funding from the State of California , Department of Water <br /> Resources, Regional Water Quality Control Board's UST Cleanup Fund . <br /> 10.0 HEALTH AND SAFETY <br /> A health and safety plan to support the field work has been developed as a stand alone <br /> document (Appendix B). Prior to commencement of field activities, a site safety meeting will <br /> be held at a designated command post near the working area. Emergency procedures will <br /> be outlined at this meeting. Also the hazards of known or suspected chemicals of interest <br /> will be reviewed. Level D personal protective equipment (PPE) is the anticipated maximum <br /> protection required . A site specific health and safety (H & S) plan that conforms to Part <br /> 1910. 120 (i)(2) of 29 CFR will be on site at all times during the course if the work. <br /> A working area will be established with barricades and warning tape to delineate the work <br /> area in which PPE must be wom . If, during drilling , fuel product odors are deemed to be <br /> significant, work will cease and the area will be evacuated , or personnel will don the <br /> appropriate respirators to allow continuation of work in a safe manner. <br /> A nearby hospital will be designated in the H & S plan as the emergency medical facility. A <br /> map with a route indicated to the hospital will be on site . <br /> I <br /> Environeering, Inc. Project No. 98412.01 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.