My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:47:59 AM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a Work Plan For Investigation of Reported Release <br /> i California Tank Lines Facility <br /> 1 Stockton, California <br /> Siena-Pacific Project No. 96-620.01 <br /> i <br /> licensed (C-57) drilling contractor for this work. The two soil borings will be excavated in the <br /> vicinity of the former UST excavation, ono"iatheautici n, <br /> i <br /> e geo o ' Each of the borings will <br /> f. be logged by a geologist. Excavated soils will be monitored for the presence of petroleum <br /> ( I <br /> hydrocarbons using a photoionization detector, as well as by observing and smelling the material for <br /> field-evident petroleum hydrocarbon contamination. Soil cuttings generated during the drilling <br /> process will be placed in DOT-approved 55-gallon steel drums, properly labeled, and left onsite <br /> '- I pending laboratory results. Soil samples will be obtained from each boring at intervals of five feet <br /> below ground surface, down to a maximum sample depth of 20 feet. Samples will also be collected <br /> I upon encountering any field-evident contamination, or just above the water table, if either condition <br /> is encountered. <br /> f <br /> 9 <br /> Three soil samples collected from each boring will be submitted to Exelchem Environmental Labs, <br /> for analysis, as described below. After drilling is completed the two soil borings will be grouted with <br /> a cement grout, and the asphalt paving will be restored at the top of each hole to match the existing <br /> pavement. <br /> J <br /> Task 3 - Laboratory Analyses <br /> JSix soil samples will be analyzed for total petroleum hydrocarbons as diesel by EPA Method 8015-m, <br /> for benzene, toluene, ethylbenzene, total xylenes (BTEX), and MTBE by EPA Method 8020. The <br /> I i <br /> soil samples will also be tested for oil and grease by EPA Method 413 . 1 in accordance with the Tri- <br /> Regional Board Staff Recommendations of the California Regional Water Quality Control Board <br /> (CRWQCB) dated August 10, 1990. The sample analyses will be completed in approximately 10 <br /> working days by Exelchem Environmental Laboratory. <br /> Task 4 - Report Preparation <br /> A report of the work completed and the findings of the investigation will be prepared at the <br /> completion of the field work and upon receipt of analytical laboratory results, <br /> it <br /> i <br /> Sierra-Pacific Groundwater Consultants, Inc. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.