My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:47:59 AM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health and Safety Plan <br /> California Tank Lines Facility <br /> Sierra-Pacific Project No. 96-620.01 <br /> 4.0 KEY PERSONNEL AND RESPONSIBILITIES <br /> Key personnel on-site will include the following representative(s) : <br /> • Site Safety Officer (SSO) <br /> Eric D. Chase, Senior Engineering Geologist <br /> Sierra-Pacific Groundwater Consultants......... ......... . . . . . . . ........ ....... . . . . . . . (916) 933-1468 <br /> • Project Manager <br /> Eric D. Chase, Senior Engineering Geologist <br /> Sierra-Pacific Groundwater Consultants. . . .... ... ....... . .. . . . . . ........ ... .... . . . . ... (916) 933- 1468 <br /> • Client Representative <br /> Mr. Jack Bishop <br /> P.O. Box 6245 <br /> Stockton, California 95206. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .. . . (916) 466-3554 <br /> 4.1 Project Manager <br /> The Project Manager is responsible for ensuring that his/her designated SSO is implementing <br /> this H&SP, for providing a copy of this plan to subcontractors and other project participants <br /> as needed, and for advising site workers on health and safety matters. <br /> All activities on site must be cleared through the Project Manager. The Project Manager has <br /> responsibility for the following: <br /> • Allocate and administer resources to successfully comply with all technical and <br /> health and safety requirements; <br /> • Authority to suspend or modify work practices if site safety conditions change or <br /> to dismiss subcontractors whose conduct does not meet the requirements <br /> specified in this Plan. <br /> • Verify that all permits, supporting documentation, and clearances are in place ; <br /> Sierra-Pacific Groundwater Consultants, Inc. 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.