My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:47:59 AM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health and Safety Plan <br /> California Tank Lines Facility <br /> Sierra-Pacific Project No. 96-620.01 <br /> ® Provide technical advice during routine operations and emergencies; <br /> • Inform the appropriate site management and safety personnel of the activities to <br /> be performed each day; <br /> • Resolve any conflicts that may arise during implementation of this H&SP; <br /> • Handle any emergency response situations that may arise; and <br /> 0 Conduct pre-job and periodic tail-gate safety meetings. <br /> 4.2 Site Safety Officer <br /> Health and safety activities are important during all phases of any project. The degree of <br /> implementation of the activities or services is related to the perceived risk. The SSO shall have <br /> the responsibility to determine health and safety needs for this project and the authority to <br /> ensure that appropriate measures are taken. The SSO shall immediately inform the Project <br /> Manager of any health and safety conditions which may adversely affect the project. <br /> Under the appropriate circumstances, the SSO is specifically required to take the following <br /> actions : <br /> • Require specific health and safety precautions prior to work site entry by all <br /> project personnel. Ensure that personnel adhere #to requirements of this H&SP. <br /> • Require any project person to obtain immediate medical attention in case of an <br /> injury or illness. <br /> • Deny access to project personnel to the site or any work site in the event that to <br /> enter such an area would pose an unacceptable risk. <br /> • Order the immediate evacuations of project personnel from any work site when <br /> conditions posing an unacceptable risk arise through the course of work. <br /> Sierra-Pacific Groundwater Consultants, Inc. 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.