Laserfiche WebLink
Site Health and Safety Plan <br /> California Tank Lines Facility <br /> Sierra-Pacific Project No. 96-620.01 <br /> contact with wind and rain. Wind direction will be monitored. Should wind gusts or wind <br /> direction shift, the SSO will place workers in up- or off-wind positions. If this is not possible, <br /> work may be temporarily halted until the downwind conditions have shifted. <br /> Heat stress may be reduced by conducting treatment operations at night. Depending on <br /> weather conditions and personnel monitoring results, the SSO may require that operations be <br /> conducted duringhours of darkness. Should operations be conducted during hours of darkness <br /> P g , <br /> sufficient lighting will be required. <br /> 3 <br /> 11 <br /> ii <br /> l <br /> Sierra-Pacific Groundwater Consultants, Inc. 27 <br />