My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:47:59 AM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health and Safety Plan <br /> California Tank Lines Facility <br /> Sierra-Pacific Project No. 96-620.01 <br /> 11.0 DECONTAMINATION PROCEDURES <br /> 11 .1 Apparel Decontamination <br /> The SSO may establish at least one safety apparel decontamination station at each work site . <br /> At a minimum, soap/detergent, rinse water, towels, wash pans, and brushes for scrubbing boots <br /> shall be available. Decontamination will consist of removing any potentially contaminated soil <br /> from boots by washing with soap and water or removing boot covers in the contamination <br /> reduction zone upon exit from the work zone . Wash water will be available in a tub suitable <br /> for standing in while washing boots. As necessary, this wash water will be contained, sampled, <br /> and properly disposed. <br /> 11.2 Equipment Decontamination <br /> Materials remaining on tools or sampling equipment will be removed by steam cleaning or a <br /> high pressure washer. Water used for decontamination will be containerized and sampled for <br /> Pro disposal, <br /> Per P <br /> Sierra-Pacific Groundwater Consultants, Inc. 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.