Laserfiche WebLink
i r . <br /> Site Health and Safety Plan <br /> California Tank Lines Facility <br /> Sierra-Pacific Project No. 96-620.01 <br /> All personnel assigned on-site shall provide written documentation to the SSO that they have <br /> completed necessary medical examination and pulmonary function tests prior to on-site work. <br /> This documentation shall consist of forms or letters signed by an examining physician indicated <br /> that the individual has been cleared to work in areas of potential exposure to toxic/hazardous <br /> materials and is physically able to wear respirators. <br /> _J <br /> LJ <br /> Il <br /> i- <br /> Sierra-Pacific Groundwater Consultants, Inc. 31 <br />