Laserfiche WebLink
0aw '% " <br /> California Tank Lines, Inc. Page 2 of 3 <br /> 3105 South EI Dorado Street November 6, 2014 <br /> Stockton, California 95206 <br /> • Submittal of up to twenty-four soil samples for analysis of total petroleum hydrocarbons <br /> (TPH) as gasoline (TPHg), TPH as diesel (TPHd) and TPH as motor oil (TPHo); and <br /> submittal of one soil sample that exhibits the highest TPHg concentrations from each <br /> boring for analysis of benzene, toluene, ethylbenzene and total xylenes (BTEX); methyl <br /> tertiary-butyl ether (MTBE), ethyl tertiary-butyl ether (ETBE), tertiary-amyl methyl ether <br /> (TAME), di-isopropyl ether (DIPE) and tertiary-butyl alcohol (TBA); <br /> • Installation of two wells (DW-6 and DW-7) on the west side of South EI Dorado Street <br /> using four-inch-diameter polyvinyl chloride (PVC) casing and one well (DW-8) on the <br /> east side of South EI Dorado Street using two-inch-diameter PVC casing with screen <br /> intervals between approximately twenty and thirty-five feet bsg in all three wells, <br /> dependent on geologic/hydrogeologic conditions encountered during drilling; <br /> • Following the installation of the well casing, construction of the wells with a gravel pack <br /> placed in the annular space from total depth of the boring to two feet above the 0.020- <br /> inch slotted PVC casing, followed by development of the well using a surge block, then <br /> installation and hydration of three feet of bentonite chips, followed by installation of <br /> bentonite grout from above the bentonite chips to three feet bsg; <br /> • Collection of groundwater samples quarterly from the three newly installed wells (DW-6, <br /> DW-7 and DW-8) and five existing wells for analysis of TPHg, TPHd, TPHo, BTEX, <br /> MTBE, ETBE, TAME, DIPE and TBA; (If product is present in the groundwater, the well <br /> will not be purged and a grab groundwater sample will be collected under the product for <br /> analysis of TPHg, TPHd, TPHo, BTEX, MTBE, ETBE, TAME, DIPE and TBA.) <br /> • Survey of the existing and newly-installed wells and update of the site map based on the <br /> survey data; and <br /> • Submittal of Site Assessment Report prepared by DES that includes all documentation <br /> signed by facilities receiving waste generated during the well installations. <br /> The EHD approves the work plan with the following conditions: <br /> • Submittal of soil samples collected at five and ten feet bsg from each of the three <br /> borings for analysis of TPHg, BTEX and MTBE if justified by odor, staining or elevated <br /> organic vapor readings; <br /> • Hydrate the bentonite chips for at least thirty minutes before installing the grout; <br /> • "Bentonite grout" may only contain five percent bentonite; the EHD prefers using neat <br /> cement; <br /> • Quarterly monitor and sample only the three newly-installed wells and only for one year; <br /> the existing wells should be monitored and the groundwater collected for analysis based <br /> on the EHD directives by letters dated 9 September 2014, and 30 October 2013; and <br /> • Identification of the three new wells as MW-6, MW-7 and MW-8 instead of DW-6, DW-7 <br /> and DW-8 for consistency in well nomenclature and the elimination of future potential <br /> confusion of these wells for domestic wells or deep wells. <br />