My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
COMPLIANCE INFO 2004 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 8:52:05 AM
Creation date
7/24/2019 4:44:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2011
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N=UNtFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2 <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION ago-1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item o ) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> L FACILITY INFORMATION <br /> FACILITY ID#(Agency a Only) I I I - I I I -1 1 1 1 1 1 1 <br /> BUSINESS NAME(Same as CILITY NAME)° 1 I W JZ- I,p a R-01 3. <br /> BUSINESS SITE ADDRESS L� L m AR-Ct'NQ 10(z- 103. CITY 104. <br /> EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and 'bration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers' ctions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 C R§2632,2634,2638,2641 <br /> MONITORING EQUIPMENT IS SERVICE 1.ANNUALLY El99.OTHER(Specify): -490-3b <br /> M.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMII'TEWITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o-4 <br /> IV.TANK MONTTORIN IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITO G OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISU AL . (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a.DRY b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490.6 <br /> PANEL MANUFACTURER:' - 4901. MODEL#: LS Q( 49M <br /> LEAK SENSOR MANUFACTURER: !_ 41. MODEL#(S):or)/o 14 O y y 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO ONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> _ IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ❑ d.MONTHLY -------490.17 <br /> ❑ e.OTHER(Specify): <br /> ---------- --------------- ----- --------- ------- <br /> 490.18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ ..OTHER(Specify): 490-19 <br /> 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR 646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 4990-n <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: a ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER( cify): 490-25 <br /> 490-26 <br /> ❑99.OTHER (Specify): 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLO G METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDAR CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:Na.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED d.UNDER VACUUM 490 29 <br /> 0-90-31 <br /> PANEL MANUFACTURE <br /> 0-90.30 MODEL#: "r'L S R `Lac 1� � r� <br /> LEAK SENSOR MANUFACTURER: L �1aL Q0 490-32 MOREL#(S)_ �.3 rf(J_ O� 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ❑b.NO ago-30- <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMPS OWN. ❑a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p h.L K TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 490-36 <br /> MLLD MANUFACTURER(S): f4 D 490-37 MOD #(S): L -2--2-d7VV <br /> 490.38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g p.h.LEAK TlkTS (23 CCR§2636) - - 490-39 <br /> MODEL M <br /> ELLD MANUFACTURER(S) 490 10 O ---- 490-41 <br /> # ): - <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM A AL 0.1 g.p.h.� 490.42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ .YES ❑b.NO 490-44 <br /> 4.PIPE INTEGRITY TMTING 490-45 <br /> TEST FREQUENCY a a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49046 490-47 <br /> 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY JW a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 490-49 <br /> •Allowod for monitoring of unburied ernergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA]23 CCR§2636(n)(3)].. ago-so <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO TANK SYSTEM <br /> 490-51 <br /> 490.52 <br /> ❑ <br /> 99.OTHER(Specify) 490-13 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.