My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6649
>
2300 - Underground Storage Tank Program
>
PR0231098
>
COMPLIANCE INFO 2004 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 8:52:05 AM
Creation date
7/24/2019 4:44:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2011
RECORD_ID
PR0231098
PE
2361
FACILITY_ID
FA0003830
FACILITY_NAME
VILLAGE WEST MARINA
STREET_NUMBER
6649
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09815006
CURRENT_STATUS
01
SITE_LOCATION
6649 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> ' UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VL UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 490.548 <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> ❑ 1.CO US ELECTRONIC MONITORING '%2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPEN ❑99.OTHER S ): <br /> PANEL MANUFA TURER 490 s6. <br /> LEAK SENSOR ACTURER: 490-57 i MODEL#(S): 490-5e <br /> DETECTION OFA INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRI ERS AUTOMATIC PUMP SHUTDOWN ❑ a YES ❑b.NO 490-60. <br /> FAILURE/DISCONNECTI OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS FLOW OF PRODUCT AT THE DISPENSER ❑ a YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS 1.S LE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> 490-64a <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MO RED BY: 1.LIQUID Q 2.PRESSURE 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CO AINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a YES [I b.NO ago 64b <br /> VIL PERIODIC SYSTEM TESTING <br /> ❑ 1. ELD TESTING. THIS FACILITY HAS BEEkNOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED ago 6s. <br /> LEAK D MUST BE PERFQRW. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS ASREQUIRED- 23 CCR 2644.1 <br /> 2.SECONDARY CONTAINMENT COMPONENTS TESTED EVERY 36 MONTHS. 4�_ <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. ago 67 <br /> RECORDKEEPING <br /> The following mon itociog/mau tenance records are kept forthis fa . <br /> cil <br /> $�Alarm logs 49D-6u ❑Visual Inspection Records ago Gab ❑Tank integrity testing results ago bac <br /> ❑SIR testing results(and supporting documentation records)_ ago-ad Tank gauging results(and supporting documentation records). 490-68c <br /> ❑ATG Testing results(and supporting documentation records).490-her Corrosion Protection 60-day logs 490-ag <br /> REquipment maintenance and calibration records. 49m a <br /> UL G <br /> Personnel with UST monitoring responsibilities are familiar with all of the follNdboatply) <br /> ments relevant to their job duties. 49069& <br /> RENCE DOCUMEN'T'S MAINTAINED AT FACU ITY(Check allTHIS UNDERGROUND STORAGE TANK MONITORING PLAN(Req9b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPquired)49"9c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4 <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49o4ge <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"49o-69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYS S"490-ft <br /> ❑ OTHER(Specify):M69k M6gi <br /> This facility has a"Designated UST Operator"who has passed the California UST System Exam administered by the <br /> International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance the UST systems annually,and within 30 days of hire-This <br /> training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monito Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.ago-7o <br /> 3L CON'IIVIENTS/ADDMONAL INFOtl� <br /> TIO <br /> Provide additional comments here or indicate how many pages with additional information on specificringare attached to this Plan-a90 7r <br /> �T 1 q S <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained Properly. <br /> The follow" pe n(s) responsible for performing the monitoring and equipment maintenance: -, '^ <br /> NAME r n 490-72 TITLE 4f_i \ 490-73 <br /> NAME 4go-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inf ' the owner/operator of any <br /> conditions that need follow-up action. _ <br /> XM OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. — <br /> APPLICANT SIGNA'� 490-76 DATE: 49.0-717 <br /> REPRESEMING: 1.Tank OwnerlO tutor 2.Favi m Qmm_uJ0NmtDr rl 3.Auth2nwd R r e tativ_e of Ov <br /> -- 490.7$ 490-79 <br /> APPLICANT NAME rtnt): APPLICANT TITLE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.