Laserfiche WebLink
Jun 11 04 12:57a Mike Dotten (209) 533-2650 p.3 <br />• In -Tank Gauging / SIR Equipment: <br />❑Check this box if tank gauging is used only for inventory control and disregard the following section. <br />®Check this box if no tank gauging or SIR equipment is installed and disregard the following section. <br />(This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring). <br />Comnlete the following checkikt- <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank -gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />AU MW OWUMM a, ocivw, ura:riuC uow anu ween ineie ueneiencies were or win oe Corrected. <br />G. Line Leak Detectors (LLD): <br />❑ Check this box if LLDs are not installed and disregard the following section. <br />❑ Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a teak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />❑ Yes <br />® No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />® N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />® N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />® NIA <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® N/A <br />® Yes <br />® No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />-- in the aecrion n, oeiow, AescriDe now and when these deficiencies were or will be corrected. <br />H. Comments: Lines and LLDs were not tested. The monitoring system was in such unworkable <br />condition that it was decided to voluntarily shut down the facility until repairs could be implemented and <br />monitoring restored. At that time line tests and LLD tests will be performed. <br />Page 3 of 3 03101 <br />