Laserfiche WebLink
-------- <br /> Pacific <br /> Pacific Pride — South EI Dorado Street Page 2 <br /> 3147 South EI Dorado Street October 18, 2011 <br /> Stockton , California 95206 <br /> Once the DPE system has been installed , AGE proposes to collect influent and effluent soil <br /> gas samples and DPE (pre-treatment, intermediate-treatment, and post treatment) water <br /> samples daily during approximately the first week of operating the remediation system . AGE <br /> proposes to analyze the samples for TPH-g , BTEX, MTBE , TBA and 1 ,2-DCA. Based on <br /> historical analytical data, the EHD believes TBA should be omitted and TAME should be <br /> added to the list of analytes . <br /> Also during the first week of operations , AGE proposes to monitor daily the operational <br /> parameters : depth-to-water measurements, soil-vapor concentrations , DPE air flow, vacuum , <br /> total gallons of water extracted , pressure , pH , temperature, and volume of processed vapor. <br /> Following the initial first week of operating the DPE system , AGE proposes to monitor <br /> operational parameters weekly, and monthly collect and analyze influent and effluent soil gas <br /> samples for TPH-g , BTEX and MTBE ; and monthly collect and analyze groundwater from the <br /> pre-, med- and post-treatment sampling ports for TPH-g , TPH-d, BTEX, MTBE , ETBE , TAME, <br /> DIPE , TBA, 1 ,2-DCA and EDB. <br /> AGE proposes to process the DPE groundwater through three 2,000-pound vessels <br /> containing liquid-phase activated carbon prior to discharging the groundwater into the sanitary <br /> sewer system under City of Stockton permit; and process the DPE soil vapor through an <br /> electric-heated catalytic oxidizer prior to entry into the atmosphere under San Joaquin County <br /> Air Pollution Control District permit. <br /> AGE proposes to submit a report of findings following the well installations, baseline <br /> groundwater sampling event and installation of the DPE system; and quarterly thereafter, <br /> AGE proposes to submit reports documenting the system performance . <br /> The EHD approves the work plan as summarized above. On 30 September 2011 , the EHD <br /> posted public notification of pending approval by this department of the Remedial Action Work <br /> Plan to implement remediation at this site. The public has 30 days to express concerns <br /> regarding the pending remediation at this site. If none is received, fieldwork may commence <br /> on 31 October 2011 . <br /> If you have any questions, please contact Vicki McCartney at (209) 468-9852 or by email at <br /> vmccartney@sjcehd . com. <br /> Sincerely, <br /> Victoria L. McCartney, REHS V Nuel C. Henderson , Jr. , PG <br /> Senior Registered Environmental Health Specialist Engineering Geologist <br /> c: Mr. Timothy J . Cuellar, Advanced GeoEnvironmental , Inc. , 837 Shaw Road , Stockton, <br /> California 95215 <br /> Mr. James L. L. Barton , PG, California Regional Water Quality Control Board Central <br /> Valley Region , 11020 Sun Center Drive, Suite 200 , Rancho Cordova , California 95670 <br />