My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3147
>
3500 - Local Oversight Program
>
PR0544705
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2019 10:46:31 AM
Creation date
7/29/2019 10:40:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544705
PE
3526
FACILITY_ID
FA0003754
FACILITY_NAME
CALIFORNIA FUELS
STREET_NUMBER
3147
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512003
CURRENT_STATUS
02
SITE_LOCATION
3147 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> 16 August 2011 <br /> AGE-NC Project No . 97-0301 <br /> Page 8 of 11 <br /> temperature and electrical conductivity have stabilized . However, if a well is purged dry <br /> priorto evacuating three casing volumes, a ground watersample will be collected following <br /> 80 percent recovery of ground water level within the well or within 8-hours of well <br /> evacuation . <br /> Purge water and decontamination water generated during the ground water sampling <br /> activities will be contained in DOT-approved drums which will be appropriately labeled for <br /> storage . Drums containing purge water will be stored on-site pending appropriate removal <br /> and disposal . <br /> 3 .2 .4. 3 . Sample Withdrawal <br /> Water samples will be collected from the remediation wells using a disposable polyethylene <br /> bailer or a dedicated teflon tubing used in conjunction with an inertia pump. The bailers are <br /> disposed of after one use and require no decontaminating and the teflon tubing used with <br /> the inertia pump is either dedicated to each well or changed at each sampling event, <br /> thereby minimizing cross contamination due to sampling devices. Samples will be drawn <br /> and collected in such a manner that agitation and exposure of the ground water to the <br /> atmosphere are minimal . <br /> 3 .2 .4 .4 . Sample Handling <br /> Ground water samples will be collected into laboratory supplied containers . Ground water <br /> samples will be to be analyzed forTPH-g , TPH-d , BTEX, oxygenated compounds (MTBE , <br /> TAME , ETBE , DIPE and TBA) and fuel additives ( 1 , 2-DCA and EDB) will be collected into <br /> 40-milliliter (ml ) volatile organic analysis (VOA) vials containing 0 .5-ml of hydrochloric acid <br /> as preservative and a 1 -liter amber bottle with no preservative. Following collection , the <br /> samples will be placed on ice and kept in a cooler until delivered to the laboratory for <br /> analysis . Chain of custody protocols will be used to document sample custody transfer <br /> from the field to the analytical laboratory. A chain of custody form will accompany the <br /> samples. r <br /> 3 . 3 . REMEDIATION SYSTEM PIPING NETWORK <br /> A network of one-inch diameter, schedule 40 PVC piping will be installed from the two <br /> proposed DPE wells , VW-1 through VW-3 and MW-7 in a series of trenches , approximately <br /> 24-inch wide and 18-inches deep. Additionally, two-inch diameter, schedule 40 PVC casing <br /> will be inserted over the 1 -inch piping as secondary piping containment. All PVC piping will <br /> be routed underground from each well head to the DPE liquid-ring blower, located inside <br /> the remediation system fenced enclosure (Figure 3) . A PVC ball valve will be installed at <br /> Advanced GcoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.