Laserfiche WebLink
I <br /> ' Multi Level Monitoring Well Installation Report - Third Quarter 2003 <br /> s <br /> PACIFIC PRIDE - SOUTH EL DORADO <br /> i ' 3147 South El Dorado Street, Stockton, California <br /> TABLE OF CONTENTS <br /> FIGURES <br /> Figure 1 -Location Map <br /> ' Figure 2 - Site Plan <br /> Figure 3 - Geologic Cross Section D-D' <br /> Figure 4 - Geologic Cross Section F-F' <br /> Figure 5 -Multi-Level Well Screen Interval MW-8 <br /> Figure 6 -Multi-Level Well Screen Interval MW-9 <br /> Figure 7 -Multi-Level Well Screen Interval MW-10 <br /> ' Figure 8 -Multi-Level Well Screen Interval MW-II <br /> Figure 9 -Multi-Level Well Screen Interval MW-12 <br /> Figure 10 -Monitoring Well Design MW-8 <br /> ' Figure 11 -Monitoring Well Design MW-9 <br /> Figure 12 -Monitoring Well Design MW-10 <br /> Figure 13 -Monitoring Well Design MW-11 <br /> '. Figure 14 - Monitoring Well Design MW-12 <br /> Figure 15 -Hydrocarbon Impacted Soil Plume Cross Section D-D' <br /> Figure 16 -Hydrocarbon-Impacted Soil Plume Cross Section F-F' <br /> TABLES <br /> Monitorin <br /> Table 1 -Summary ofMonitoring Well Details � <br /> Table 2 -Analytical Results of Soil Samples <br /> ' APPENDICES <br /> Appendix A- Work Plan Approval Letter&Drilling Permit <br /> ' Appendix B -Boring Logs MW-8, MW-9, MW-10, MW-I1 &MW-12 <br /> Appendix C -Field Logs for Well Development Activities <br /> Appendix D - Surveying Report-Mid Coast Engineers <br /> ' Appendix E -Analytical Results of Soil Samples <br /> Advanced GeoEnvironmental Inc <br />