Laserfiche WebLink
' 16 <br /> 10 August 2001 <br /> AGE-NC Project No 97-0301 <br /> ' Page 5 of 5 <br /> • Continued ground water monitoring concurrently with the California Tank-Line Inc site <br /> (3105 South El Dorado Street) The next quarterly ground water monitoring event is <br /> tentatively scheduled for 27 June 2001 <br /> • Continued utilization of wells MW-1 through MW-7 for characterization of ground water <br /> ' conditions at the site <br /> • Additional vertical ground water assessment is warranted near the former UST area and in <br /> the area east of MW-7 <br /> Cone penetrometer testing(CPT) soil borings were advanced at the site in July 2001 and a report of <br /> ' findings is forthcoming Based on data collected from the CPT soil borings, AGE will propose <br /> installation of additional deep-screened ground water monitoring wells, the screen Intervals for the <br /> ' deep-screened monitoring wells will be placed to define and momtor the horizontal extent of the <br /> ground water plume In each Informal hydrologic unit Identified by the CPT Investigation <br /> 6 0 LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing In this or similar localities The findings were based upon <br /> analytical results provided by an Independent laboratory Evaluation of the hydrogeologic conditions <br /> ' at the site for the purpose of this Investigation was made from review of previous consultants reports <br /> and a limited number of available data points(ground water samples)and subsurface conditions may <br /> vary away from these data points No other warranty, expressed or implied, is made as to the <br /> i ' professional recommendations contained in this report <br /> 1 <br /> Advanced GeoEnviroamental,Inc <br />