My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
WORK PLANS CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 11:52:55 AM
Creation date
7/30/2019 11:45:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H ASE <br /> GEO P n <br /> ft <br /> ENVIRONMENTAL <br /> December 12, 2003 <br /> i <br /> Mr. Pat O'Rourke i <br /> Bank of Stockton <br /> 660 N. Main Street <br /> Manteca, CA 95336 <br /> RE: Corrective Action Plan <br /> Cutter Lumber—Western Lift Site,3930 S.�EI Dorado Street,Stockton <br /> (USTCFP Site Code 1878;CWRCB GID Code T0607700498) <br /> Dear Mr. O'Rourke: <br /> On August;l, 2003, Geo-Phase Environmental Inc. suljmitted a document entitled Report - <br /> Remedial Action Pilot Test&Feasibility Study. The purpose of the Feasibility Study was to <br /> summarize all available information regarding the gasoline release at the subject site and to <br /> assess the feasibility of four possible strategies to 'mitigate it. The Feasibility Study <br /> concluded that the method most likely to achieve an adequate level of mitigation in a <br /> reasonable time is the simultaneous application of vapor extraction and air sparging. <br /> 1.: On September 29, 2003, the San Joaquin County Environmental Health Department directed <br /> that a detailed Corrective Action Plan (CAP) be prepared and submitted documenting the <br /> methods and protocols to be used in the work outlined in the Feasibility Study. This current <br /> document is a detailed work plan intended to address these issues.. <br /> If you have questions about the content of the Work Plan or need additional information, <br /> please contact me. Thank you for this opportunity to serve your environmental needs. <br /> Sincerely, <br /> LGeo-Phase Environm 1 Inc. <br /> Stephen M.,Lankford, RG, REA <br /> President <br /> cc: Harlan Knoll, San Joaquin Co.,PHS/EHD <br /> Tony Palma,Cutter Lumber Products <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.