Laserfiche WebLink
TABLEOF CONTENTS - <br /> o <br /> 1.0 INTRODUCTION <br /> 1.1- Current Site Status <br /> 1.2 Proposed Scope of Work <br /> 1.2.1 Conceptual Basis <br /> fi 1.2.2 Scope of Work ' <br /> 2.0 PRELIMINARY WORK <br /> 2.1 Well Permitting <br /> 2.2 Air Pollution Control District Permit to.Operate` <br /> 3.0 SERVICE WELL INSTALLATION " <br /> 3.1 Soil Boring Installation x <br /> 3.2 Remedial Well Construction <br /> 3.2.1 Vapor Extraction Well Construction ' <br /> 3.2.2 Air Sparge Well Construction <br /> 3.3 Waste Disposal, <br /> 4.0 SURFACE.EQUIPMENT INSTALLATION &-SYSTEM OPERATIONi' <br /> 4.1 Equipment Installation <br /> .4.1.1 Conveyance Piping/Manifold Installation <br /> 4.1.2 Sparge Pump Installation <br /> 4.1.3 Vapor Extraction Blower Installation. <br /> 4.1.4 Catalytic Oxidizer.Installation <br /> 4.1.5 Carbon Unit Installation k <br /> 4.2 System Operation <br /> 4.2.1 <br /> 'Vapor Extraction System Start-Up <br /> 4.2.2 Air Sparge System Start-Up <br /> 4.3 System Monitoring <br /> 4.3.1 Process/Effluent Air Monitoring <br /> 4.3.2 Sparge.Air Monitoring s ' <br /> 5.0 SOIL & AIR SAMPLING & ANALYSIS PROCEDURES <br /> 5.1 Soil Sample Collection <br /> L 5.2 Air Sample Collection <br /> 5.3 Soil Sample Analysis <br /> 5.4 Air Sample Analysis <br /> 6.0 REPORTING <br /> 6.1 Report of System Installation. <br /> . 6.2 Quarterly Reporting <br /> 7.0 PROJECT TIME SCHEDULE <br /> 8.0 SIGNATURES AND CERTIFICATION <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone(209)569-0293 + <br /> Modesto,CA 95356` Fax(209)569-0295 <br />