My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3430
>
3500 - Local Oversight Program
>
PR0544710
>
WORK PLANS CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 11:52:55 AM
Creation date
7/30/2019 11:45:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
CASE 1
RECORD_ID
PR0544710
PE
3528
FACILITY_ID
FA0006247
FACILITY_NAME
Western Lift
STREET_NUMBER
3430
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17525063
CURRENT_STATUS
02
SITE_LOCATION
3430 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Corrective Action Plan Page 3 <br /> Cutter/Western Lift Site <br /> ( GPE Project No. 102.3 <br /> I December 12,2003 <br /> Fri %i <br /> radius of influence was 40 feet for sparge wells and something less than 19 feet for vapor <br /> extractors. <br /> During the early phases of operation,the evolved vapors Will be relatively rich in gasoline. To <br /> destroy the entrained gasoline; a trailer-mounted Catalytic Thermal Oxidizer system will be <br /> used to destroy the gasoline. To achieve complete destruction, propane fuel will be mixed <br /> with the vapor prior to combustion. As the operation proceeds, the gasoline concentration of <br /> the extracted vapor will decline substantially.,At some:"Point, the operating expenses of the <br /> Catox system will become excessive, and the system will be replaced with a system of <br /> activated carbon filters: <br /> 1.2.2 Scope of Work <br /> r The tasks described in this Work Plan encompass the following principal elements. <br /> • Install and operate a vapor extraction / air sparge system. The system will consist of 4 <br /> sparge and 6 vapor extraction wells. One vapor extractor and one sparge well are already <br /> in place, 'and it will only be necessary to;drill three'!additional sparge wells and 5 vapor <br /> extraction wells. <br /> • The gasoline-laden vapors removed b the extractions's stem will be treated initially with a � <br /> g P Y Y Y <br /> thermal catalytic oxidizer (Catox) system, and later with an activated carbon filtration <br /> system to destroy the evolved air/fuel mixture by combustion. <br /> • Prepare a report of the installation of the remedial system. Also complete four additional <br /> quarterly`reports of the operation of the system. <br /> Upon approval of this work plan by the LOP agency a detailed budget covering the first phase <br /> will be prepared and submitted to the State USTCFP for pre-approval of the expenditures. <br /> Prior to completion of the installation of additional air sparge and vapor extraction wells, an <br /> additional pre-approval submittal will be completed for this work. <br /> 2937 Veneman Ave.,#B240 Geo-.Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.