Laserfiche WebLink
Corrective Action Plan Page 4 <br /> Cutter/Western Lift Site <br /> GPE Project No. 102.3 <br /> December 12,2003 <br /> 2.0 PRELIMINARY WORK <br /> Permitting for the proposed on-site work will,include permits from the San Joaquin County <br /> Environmental Health Department (SJC-EHD) and th'e San Joaquin Valley Unified Air <br /> Pollution Control District(SJVUAPCD). <br /> 2.1 Well Installation Permits j <br /> A well installation permit will be submitted to the SJC-EHD for the installation of the vapor <br /> extraction wells and air sparge wells. 'E <br /> 2.2 Air Pollution Control District Permit to Operate <br /> A "Permit to Operate" application will be submitted to the SJVUAPCD for the operation of <br /> the "Catox" system and the carbon filtration system. It is anticipated that permitting process <br /> will take at least 60 days, and the allowable effluent contaminant flow rate will be less than 2 <br /> pounds per day. Anticipated future "changes in air regulations could substantially alter the <br /> permit requirements. <br /> 's <br /> L <br /> I <br /> 2937 Veneman Ave:,#13240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto, CA 95356 Fax(209)569-0295 <br />