Laserfiche WebLink
i <br /> Corrective Action Plan Page 12 <br /> Cutter/Western Lift Site <br /> GPE Project No. 102.3 <br /> December 12,2603 <br /> f 6.0 REPORTING <br /> Reports will be submitted upon completion of various aspects of remedial systems installation <br /> and operation. <br /> 6.1 Report of System Installation' <br /> A report documenting the installation�the remedial system will be prepared. The report will <br /> document the drilling of soil borings and construction of service wells. It will also document <br /> the installation of conveyance piping and surface equipment. <br /> 6.2 Quarterly Monitoring <br /> In addition to quarterly groundwater'monitoring reports;" a quarterly report will be generated <br /> that documents the operation of the ""remedial system and includes the field data collected . <br /> during system monitoring and provides calculation of the contaminant mass that has been <br /> removed and destroyed. <br /> I <br /> j <br /> j <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br />